Advertisement

Analysis of the capacity control option: FECC

Abstract

Corresponding to the postulation of firstly evaluating the components CC and PC before the analysis of the whole concept for SCPC, the following chapter considers the CC component performed in the waste incineration industry.

Keywords

Fuzzy System Profit Margin Solution Concept Planning Period Waste Incineration 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Betriebswirtschaftlicher Verlag Dr. Th. Gabler | GWV Fachverlage GmbH, Wiesbaden 2008

Personalised recommendations