Having investigated the BACAP, the QCSP, and the QCSPTW in detail in previous chapters, it is now turned to an integration of these problems. This study completes the realization of the integration concept that has been designed in Chapter 5. Section 8.1 outlines the functional integrations of crane scheduling into the berth planning phase in the context of practical application. Sections 8.2 and 8.3 describe the integration of QCSP and QCSPTW into the BACAP, respectively. Computational tests follow in Section 8.4. The study on integrated operations planning is concluded in Section 8.5.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2009 Physica-Verlag Heidelberg
About this chapter
Cite this chapter
Meisel, F. (2009). Integration of Quay Crane Scheduling into the BACAP. In: Seaside Operations Planning in Container Terminals. Contributions to Management Science. Physica-Verlag HD. https://doi.org/10.1007/978-3-7908-2191-8_8
Download citation
DOI: https://doi.org/10.1007/978-3-7908-2191-8_8
Published:
Publisher Name: Physica-Verlag HD
Print ISBN: 978-3-7908-2190-1
Online ISBN: 978-3-7908-2191-8
eBook Packages: Business and EconomicsBusiness and Management (R0)