Abstract
Concerning the Austro-Soviet contract in general the following five units of each instrument had to be developed, tested and delivered:
-
a mock-up unit for mechanical integration tests in a full-size model of the space station MIR the dimensions of which had to correspond with those of the flight unit,
-
a technological unit for qualification and integration tests in an electrical equivalent to the space station which had to correspond precisely with the flight unit concerning mechanical construction and electrical input and output parameters,
-
a model used for cosmonaut training equivalent to the flight unit concerning design and handling,
-
a flight unit to be used on board the space station MIR during the Austro-Soviet mission,
-
a spare flight unit to be used on board the space station MIR in case of severe troubles with the flight unit.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Editor information
Rights and permissions
Copyright information
© 1992 Springer-Verlag/Wien
About this chapter
Cite this chapter
Feichtinger, C., Josseck, B., Berzhatyi, V., Batenchuk-Tusko, T., Kozharinov, V. (1992). Acceptance-, Qualification- and Delivery Procedures for AUSTROMIR ’91 Hardware. In: Health from Space Research. Springer, Vienna. https://doi.org/10.1007/978-3-7091-9260-3_1
Download citation
DOI: https://doi.org/10.1007/978-3-7091-9260-3_1
Publisher Name: Springer, Vienna
Print ISBN: 978-3-211-82413-9
Online ISBN: 978-3-7091-9260-3
eBook Packages: Springer Book Archive