Advertisement

Technical Economical Analysis

  • Da WangEmail author
  • Wei Zhang
  • Xiaoxi Zhang
  • Guolong Zhao
  • Ruqiang Zuo
  • Jialu Ni
  • Gansheng Yang
  • Jun Jia
  • Kaihua Yang
  • Yongyi Zhu
  • Wenwei Xie
  • Wenjian Zhu
  • Peifeng Zhang
  • Lasheng Fan
  • Jianliang Ye
  • Yongping Wang
Chapter
Part of the Springer Geology book series (SPRINGERGEOL)

Abstract

CCSD-1 Well was officially started on June 25th, 2001, and the designed coring drilling tasks was completed on January 23rd, 2005, when drilled to 5118.2 m. From January 25th, 2005 to March 8th, drilling tools were tested and the well was drilled to 5158 m, and the whole well drilling constructions were completed.

Keywords

Core Drilling Drill String Drill Pipe Drilling Project Drilling Tool 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Copyright information

© Science Press, Beijing and Springer-Verlag Berlin Heidelberg 2015 2015

Authors and Affiliations

  • Da Wang
    • 1
    Email author
  • Wei Zhang
    • 2
  • Xiaoxi Zhang
    • 3
  • Guolong Zhao
    • 4
  • Ruqiang Zuo
    • 4
  • Jialu Ni
    • 5
  • Gansheng Yang
    • 5
  • Jun Jia
    • 6
  • Kaihua Yang
    • 3
  • Yongyi Zhu
    • 5
  • Wenwei Xie
    • 5
  • Wenjian Zhu
    • 6
  • Peifeng Zhang
    • 6
  • Lasheng Fan
    • 7
  • Jianliang Ye
    • 2
  • Yongping Wang
    • 8
  1. 1.Engineering Center of Chinese Continental Scientific Drilling ProjectBeijingChina
  2. 2.China Geological SurveyBeijingChina
  3. 3.China University of Geosciences (Wuhan)Wu HanChina
  4. 4.Consulting and Research Center, Ministry of Land and ResourcesBeijingChina
  5. 5.Institute of Exploration TechniquesLangfangChina
  6. 6.Beijing Institute of Exploration EngineeringBeijingChina
  7. 7.Institute of Exploration TechnologyLangfangChina
  8. 8.Research and Design Academy of Metallurgical ProspectingBeijingChina

Personalised recommendations