Abstract
The working relationship between industrial partners often begins with a bidding procedure by which a costumer chooses a provider of works or services. From the bidder point of view, there are several risks when responding because he must propose an offer for a future development. In this context, considering the whole project cycle is essential to identify all potential risks and take them into account during the development of the technical and commercial offer. In this paper, a methodology for bidding process risk management (BPRM) is presented. It is based on the experience acquired during past projects in order to manage the risks of current BP and make it more efficient.
Chapter PDF
Similar content being viewed by others
References
Botero, J.D., Béler, C., Noyes, D., Geneste, L.: Integration of experience feedback into the product lifecycle: An approach to best respond to the bidding process. Information Control Problems in Manufacturing 14, 1095–1100 (2012)
Botero, J.D., Béler, C., Noyes, D.: Risk analysis in project early phase taking into account the product lifecycle: Towards a generic risk typology for bidding process. In: Manufacturing Modelling, Management, and Control (2013)
Wang, J., Xu, Y., Li, Z.: Research on project selection system of pre-evaluation of engineering design project bidding. International Journal of Project Management 27(6), 584–599 (2009)
Cross, N.: Engineering design methods: strategies for product design (2008)
Chalal, R., Ghomari, A.: An approach for a bidding process knowledge capitalization. World Academy of Science, Engineering and Technology 19 (2006)
Gouriveau, R., Noyes, D.: Risk management-dependability tools and case-based rea-soning integration using the object formalism. Computers in Industry 55(3), 255–267 (2004)
Botero, J.D., Noyes, D., Béler, C.: Modèle des risques pour les soumissionnaires aux appels d’offres. In: 10 Congrès International de Génie Industriel (CIGI) (2013)
Alquier, A.M., Cagno, E., Caron, F., Leopoulos, V., Ridao, M.A.: Analysis of external and internal risks in project early phase. PRIMA Project, 147–155 (2000)
Rakoto, H., Hermosillo, J., Ruet, M.: Integration of experience based decision support in industrial processes. In: International Conference on Systems, Man and Cybernetics, vol. 7, p. 6 (2002)
ISO/31000, Risk management — Principles and guidelines. ISO (2009)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2014 IFIP International Federation for Information Processing
About this paper
Cite this paper
Botero, J.D., Béler, C., Noyes, D. (2014). BPRM Methodology: Linking Risk Management and Lesson Learnt System for Bidding Process. In: Grabot, B., Vallespir, B., Gomes, S., Bouras, A., Kiritsis, D. (eds) Advances in Production Management Systems. Innovative and Knowledge-Based Production Management in a Global-Local World. APMS 2014. IFIP Advances in Information and Communication Technology, vol 438. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-662-44739-0_29
Download citation
DOI: https://doi.org/10.1007/978-3-662-44739-0_29
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-662-44738-3
Online ISBN: 978-3-662-44739-0
eBook Packages: Computer ScienceComputer Science (R0)