Abstract
The MRP management is the main content and the key link of enterprise logistics management and it is the premise of enterprise timely and accurate material supplying. In the case of the MRP management of SHRC, this paper states the MRP management present situation of SHRC, and thinks due to the staff pay less attention to MRP management work, it has many problems, for example the timeliness and accuracy are poor. Aiming at these problems, this paper puts forward some solutions.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Xi W (2008) MRP management in coal enterprises, the 11th national conference on mining systems engineering, Xuzhou
Yang X (2009) MRP analysis and design program, master’s thesis. Shandong University, Jinan
Zhang H (2012) Study on MRP optimization based on six sigma, master’s thesis. Huazhong University of Science and Technology, Wuhan
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2015 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Liu, Q., Wang, X. (2015). Material Requirement Planning Application Example Analysis-Shuohuang Railway Company Case Study. In: Zhang, Z., Shen, Z., Zhang, J., Zhang, R. (eds) LISS 2014. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-662-43871-8_39
Download citation
DOI: https://doi.org/10.1007/978-3-662-43871-8_39
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-662-43870-1
Online ISBN: 978-3-662-43871-8
eBook Packages: Business and EconomicsBusiness and Management (R0)