The case studies in DECENT were chosen in order to facilitate a detailed research of the DG project’s framework in relation to the hypotheses. Furthermore, a good representation of the different Member States had to be ensured, in order to be able to get case study information on possible effects of different settings of the power markets. As relevant indicators the level of liberalisation and market conditions, and the type of RES-E/CHP support scheme were chosen. In addition, a fair mix of the generation technologies covered in DECENT had to be maintained.

Keywords

Wind Turbine Wind Farm District Heating Wind Park Investment Subsidy 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Springer-Verlag Berlin Heidelberg 2003

Authors and Affiliations

  • Wolfram Jörß
    • 1
  • Birte Holst Jørgensen
    • 2
  • Peter Löffler
    • 3
  • Poul Erik Morthorst
    • 2
  • Martine Uyterlinde
    • 4
  • Emiel van Sambeek
    • 4
  • Timon Wehnert
    • 1
  1. 1.IZT-Institute for Future Studies and Technology AssessmentBerlinGermany
  2. 2.RISØ National LaboratoryRoskildeDenmark
  3. 3.COGEN EuropeBruxellesBelgium
  4. 4.ECN-Energy Research Centre of the NetherlandsECN Policy StudiesPettenThe Netherlands

Personalised recommendations