Skip to main content

Abstract

This chapter is devoted to the analysis of scheduling problems in parallel processor environment. As before the three main criteria to be analyzed are schedule length, mean flow time and lateness. Then, some more developed models of multiprocessor systems are described, including semi-identical processors, imprecise computations and lot size scheduling. Corresponding results are presented in the four following sections.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. D. Adolphson, T. C. Hu, Optimal linear ordering, SIAM J. Appl. Math. 25, 1973, 403–423.

    Google Scholar 

  2. A. V. Aho, J. E. Hoperoft, J. D. Ullman, The Design and Analysis of Computer Algorithms, Addison-Wesley, Reading, Mass., 1974.

    Google Scholar 

  3. S. Ashour, Sequencing Theory, Springer, Berlin, 1972.

    Google Scholar 

  4. K. Baker, Introduction to Sequencing and Scheduling, J. Wiley, New York, 1974.

    Google Scholar 

  5. J. Bruno, E. G. Coffman, Jr., R. Sethi, Scheduling independent tasks to reduce mean finishing time, Comm. ACM 17, 1974, 382–387.

    Google Scholar 

  6. J. B-Iaiewicz, W. Cellary, R. Sfiowifiski, J. Wgglarz, Deterministyczne prob-lemy szeregowania zadan na równoleglych procesorach, Cz. I. Zbiory zadan zaleznych, Podstawy Sterowania 6, 1976, 155–178.

    Google Scholar 

  7. J. Bfaiewicz, W. Cellary, R. Slowinski, J. Wgglarz, Deterministyczne prob-lemy szeregowania zadan na równoleglych procesorach, Cz. II. Zbiory zadafi zale2nych, Podstawy Sterowania 6, 1976, 297–320.

    Google Scholar 

  8. J. Blaiewicz, W. Cellary, J. Wgglarz, A strategy for scheduling splittable tasks to reduce schedule length, Acta Cybernet. 3, 1977, 99–106.

    Google Scholar 

  9. J. Blaiewicz, G. Finke, Minimizing mean weighted execution time loss on identical and uniform processors, Inform. Process. Lett. 24, 1987, 259–263.

    Google Scholar 

  10. P. Brucker, M. R. Garey, D. S. Johnson, Scheduling equal-length tasks undertreelike precedence constraints to minimize maximum lateness, Math. Oper. Res. 2, 1977, 275–284.

    Google Scholar 

  11. J. Bxaiewicz, D. Kobler, On the ties between different graph representation for scheduling problems, Report, Poznan University of Technology, Poznan, 2000.

    Google Scholar 

  12. J. Baiewicz, Simple algorithms for multiprocessor scheduling to meet deadlines, Inform. Process. Lett. 6, 1977, 162–164.

    Google Scholar 

  13. J. BXaiewicz, Scheduling preemptible tasks on parallel processors with information loss, Technique et Science Informatiques 3, 1984, 415–420.

    Google Scholar 

  14. J. Bruno, Scheduling algorithms for minimizing the mean weighted flow-time, in: E. G. Coffman, Jr. (ed.), Computer and Job-Shop Scheduling Theory, J. Wiley, New York, 1976.

    Google Scholar 

  15. P. J. Brucker, Sequencing unit-time jobs with treelike precedence on m processors to minimize maximum lateness, Proc. IX International Symposium on Mathematical Programming, Budapest, 1976.

    Google Scholar 

  16. B. Braschi, D. Trystram, A new insight into the Coffman-Graham algorithm, SIAM J. Comput. 23, 1994, 662–669.

    Google Scholar 

  17. E. G. Coffman, Jr., P. J. Denning, Operating Systems Theory, Prentice-Hall, Englewood Cliffs, N. J., 1973.

    Google Scholar 

  18. E. G. Coffman, Jr., G. N. Frederickson, G. S. Lueker, Probabilistic analysis of the LPT processor scheduling heuristic, unpublished paper, 1983.

    Google Scholar 

  19. E. G. Coffman, Jr., G. N. Frederickson, G. S. Lueker, A note on expected makespans for largest-first sequences of independent task on two processors, Math. Oper. Res. 9, 1984, 260–266.

    Google Scholar 

  20. E. G. Coffman, Jr., R. L. Graham, Optimal scheduling for two-processor systems, Acta Inform. 1, 1972, 200–213.

    Google Scholar 

  21. E. G. Coffman, Jr., M. R. Garey, Proof of the 4/3 conjecture for preemptive versus nonpreemptive two-processor scheduling, Report Bell Laboratories, Murray Hill, 1991.

    Google Scholar 

  22. E. G. Coffman, Jr., M. R. Garey, D. S. Johnson, An application of bin-packing to multiprocessor scheduling, SIAM J. Comput. 7, 1978, 1–17.

    Google Scholar 

  23. E. G. Coffman, Jr., M. R. Garey, D. S. Johnson, Approximation algorithms for bin packing–an updated survey, in: G. Ausiello, M. Lucertini, P. Serafini (eds.), Algorithm Design for Computer System Design, Springer, Vienna, 1984, 49–106.

    Google Scholar 

  24. N.-F. Chen, C. L. Liu, On a class of scheduling algorithms for multiprocessor computing systems, in: T.-Y. Feng (ed.), Parallel Processing, Lecture Notes in Computer Science 24, Springer, Berlin, 1975, 1–16.

    Google Scholar 

  25. J. Y. Chung, J. W. S. Liu, K. J. Lin, Scheduling periodic jobs that allow imprecise results, IEEE Trans.Comput. 19, 1990, 1156–1173.

    Google Scholar 

  26. R. W. Conway, W. L. Maxwell, L. W. Miller, Theory of Scheduling, Addison Wesley, Reading, Mass., 1967.

    Google Scholar 

  27. E. G. Coffman, Jr., A survey of mathematical results in flow-time scheduling for computer systems, GI–3. Jahrestagung, Hamburg, Springer, Berlin, 1973, 25–46.

    Google Scholar 

  28. E. G. Coffman, Jr. (ed.), Scheduling in Computer and Job Shop Systems, J. Wiley, New York, 1976.

    Google Scholar 

  29. E. G. Coffman, Jr., R. Sethi, A generalized bound on LPT sequencing, RAIRO- Informatique 10, 1976, 17–25.

    Google Scholar 

  30. J. Du, J. Y-T. Leung, Scheduling tree-structured tasks with restricted execution times, Inform. Process. Lett. 28, 1988, 183–188.

    Google Scholar 

  31. J. Du, J. Y-T. Leung, Scheduling tree-structured tasks on two processors to minimize schedule length, SIAM J. Discrete Math. 2, 1989, 176–196.

    Google Scholar 

  32. J. Du, J. Y-T. Leung, G. H. Young, Scheduling chain structured tasks to minimize makespan and mean flow time, Inform. and Comput. 92, 1991, 219–236.

    Google Scholar 

  33. D. Dolev, M. K. Warmuth, Scheduling flat graphs, SIAM J. Comput. 14, 1985, 638–657.

    Google Scholar 

  34. K. H. Ecker, R. Hirschberg, Task scheduling with restricted preemptions. Proc. PARLE93 - Parallel Architectures and Languages, Munich, 1993.

    Google Scholar 

  35. E. B. Fernandez, B. Bussel, Bounds on the number of processors and time for multiprocessor optimal schedules, IEEE Trans. Comput. C22, 1973, 745–751.

    Google Scholar 

  36. A. Federgruen, H. Groenevelt, Preemptive scheduling of uniform processors by ordinary network flow techniques, Management Sci. 32, 1986, 341–349.

    Google Scholar 

  37. M. Fujii, T. Kasami, K. Ninomiya, Optimal sequencing of two equivalent processors, SIAM J. Appl. Math. 17, 1969, 784–789, Err: SIAM J. Appl. Math. 20, 1971, 141.

    Google Scholar 

  38. S. French, Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop, Horwood, Chichester, 1982.

    Google Scholar 

  39. J. B. G. Frenk, A. H. G. Rinnooy Kan, The rate of convergence to optimality of the LPT rule, Discrete Appl. Math. 14, 1986, 187–197.

    Google Scholar 

  40. J. B. G. Frenk, A. H. G. Rinnooy Kan, The asymptotic optimality of the LPT rule, Math. Oper. Res. 12, 1987, 241–254.

    Google Scholar 

  41. H. N. Gabow, An almost linear algorithm for two-processor scheduling, J. Assoc. Comput. Mach. 29, 1982, 766–780.

    Google Scholar 

  42. M. R. Garey, Unpublished result.

    Google Scholar 

  43. E. Horowitz, S. Sahni, Exact and approximate algorithms for scheduling nonidentical processors, J. Assoc. Comput. Mach. 23, 1976, 317–327.

    Google Scholar 

  44. M. R. Garey, Optimal task sequencing with precedence constraints, Discrete Math. 4, 1973, 37–56.

    Google Scholar 

  45. M. R. Garey, R. L. Graham, Bounds on scheduling with limited resources, Operating System Review, 1973, 104–111.

    Google Scholar 

  46. M. R. Garey, R. L. Graham, Bounds for multiprocessor scheduling with resource constraints, SIAM J. Comput. 4, 1975, 187–200.

    Google Scholar 

  47. T. Gonzalez, O. H. Ibarra, S. Sahni, Bounds for LPT schedules on uniform processors, SIAM J. Comput. 6, 1977, 155–166.

    Google Scholar 

  48. M. R. Garey, D. S. Johnson, Scheduling tasks with nonuniform deadlines on two processors, J. Assoc. Comput. Mach. 23, 1976, 461–467.

    Google Scholar 

  49. M. R. Garey, D. S. Johnson, Two-processor scheduling with start-times and deadlines, SIAM J. Comput. 6, 1977, 416–426.

    Google Scholar 

  50. M. R. Garey, D. S. Johnson, Computers and Intractability: A Guide to the Theory of NP-Completeness, W. H. Freeman, San Francisco, 1979.

    Google Scholar 

  51. M. R. Garey, D. S. Johnson, B. B. Simons, R. E. Tarjan, Scheduling unit time tasks with arbitrary release times and deadlines, SIAM J. Comput. 10, 1981, 256–269.

    Google Scholar 

  52. M. R. Garey, D. S. Johnson, R. E. Tarjan, M. Yannakakis, Scheduling opposing forests, SIAM J. Algebraic Discrete Meth. 4, 1983, 72–93.

    Google Scholar 

  53. R. L. Graham, E. L. Lawler, J. K. Lenstra, A. H. G. Rinnooy Kan, Optimization and approximation in deterministic sequencing and scheduling theory: a survey, Ann. Discrete Math. 5, 1979, 287–326.

    Google Scholar 

  54. T. Gonzalez, Optimal mean finish time preemptive schedules, Technical Report 220, Computer Science Department, Pennsylvania State Univ., 1977.

    Google Scholar 

  55. R. L. Graham, Bounds for certain multiprocessing anomalies, Bell System Tech. J. 45, 1966, 1563–1581.

    Google Scholar 

  56. R. L. Graham, Bounds on multiprocessing timing anomalies, SIAM J. Appl. Math. 17, 1969, 263–269.

    Google Scholar 

  57. R. L. Graham, Chapter 5 in: E. G. Coffman, Jr. (ed.), Scheduling in Computer and Job Shop Systems, J. Wiley, New York, 1976.

    Google Scholar 

  58. T. Gonzalez, S. Sahni, Preemptive scheduling of uniform processor systems, J. Assoc. Comput. Mach. 25, 1978, 92–101.

    Google Scholar 

  59. E. G. Horvath, S. Lam, R. Sethi, A level algorithm for preemptive scheduling, J. Assoc. Comput. Mach. 24, 1977, 32–43.

    Google Scholar 

  60. W. A. Horn, Minimizing average flow time with parallel processors, Oper. Res. 21, 1973, 846–847.

    Google Scholar 

  61. W. A. Horn, Some simple scheduling algorithms, Naval Res. Logist. Quart. 21, 1974, 177–185.

    Google Scholar 

  62. D. S. Hochbaum, D. B. Shmoys, Using dual approximation algorithms for scheduling problems: theoretical and practical results, J. Assoc. Comput. Mach. 34, 1987, 144–162.

    Google Scholar 

  63. T. C. Hu, Parallel sequencing and assembly line problems, Oper. Res. 9, 1961, 841–848.

    Google Scholar 

  64. O. H. Ibarra, C. E. Kim, Heuristic algorithms for scheduling independent tasks on nonidentical processors, J. Assoc. Comput. Mach. 24, 1977, 280–289.

    Google Scholar 

  65. J. R. Jackson, Scheduling a production line to minimize maximum tardiness, Res. Report 43, Management Research Project, University of California, Los Angeles, 1955.

    Google Scholar 

  66. D. S. Johnson, The NP-completeness column: an ongoing guide, J. Algorithms 4, 1983, 189–203.

    Google Scholar 

  67. R. M. Karp, Reducibility among combinatorial problems, in: R. E. Miller, J. W. Thatcher (eds.), Complexity of Computer Computations, Plenum Press, New York, 1972, 85–104.

    Google Scholar 

  68. A. W. Karzanov, Determining the maximal flow in a network by the method of preflows, Soviet Math. Dokl. 15, 1974, 434–437.

    Google Scholar 

  69. N. Karmarkar, A new polynomial-time algorithm for linear programming, Combinatorica 4, 1984, 373–395.

    Google Scholar 

  70. O. Kariv, S. Even. An 0(n2•5) algorithm for maximum matching in general graphs, 16th Annual Symposium on Foundations of Computer Science IEEE, 1975, 100–112.

    Google Scholar 

  71. S. K. Kedia, A job scheduling problem with parallel processors, Unpublished Report, Dept. of Ind. Eng., University of Michigan, Ann Arbor, 1970.

    Google Scholar 

  72. L. G. Khachiyan, A polynomial algorithm for linear programming (in Russian), Dokl. Akad. Nauk SSSR, 244, 1979, 1093–1096.

    Google Scholar 

  73. N. Karmarkar, R. M. Karp, The differing method of set partitioning, Report UCB/CSD 82/113, Computer Science Division, University of California, Berkeley, 1982.

    Google Scholar 

  74. M. Kunde, Beste Schranke beim LP-Scheduling, Bericht 7603, Institut für Informatik and Praktische Mathematik, Universität Kiel, 1976.

    Google Scholar 

  75. E. L. Lawler, Optimal sequencing of a single processor subject to precedence constraints, Management Sci. 19, 1973, 544–546.

    Google Scholar 

  76. E. L. Lawler, Combinatorial optimization: Networks and Matroids, Holt, Rinehart and Winston, New York, 1976.

    Google Scholar 

  77. Law82a E. L. Lawler, Recent results in the theory of processor scheduling, in: A. Bachem, M. Grötschel, B. Korte (eds.) Mathematical Programming: The State of Art, Springer, Berlin, 1982, 202–234.

    Google Scholar 

  78. E. L. Lawler, Preemptive scheduling in precedence-constrained jobs on parallel processors, in: M. A. H. Dempster, J. K. Lenstra, A. H. G. Rinnooy Kan (eds.), Deterministic and Stochastic Scheduling, Reidel, Dordrecht, 1982, 101–123.

    Google Scholar 

  79. C.-Y. Lee, Parallel processor scheduling with nonsimultaneous processor available time, Discrete Appl. Math. 30, 1991, 53–61.

    Google Scholar 

  80. J. K. Lenstra, Sequencing by Enumerative Methods, Mathematical Centre Tract 69, Mathematisch Centrum, Amsterdam, 1977.

    Google Scholar 

  81. J. W. S. Liu, C. L. Liu, Performance analysis of heterogeneous multiprocessor computing systems, in E. Gelenbe, R. Mahl (eds.), Computer Architecture and Networks, North Holland, Amsterdam, 1974, 331–343.

    Google Scholar 

  82. J. W. S. Liu, C. L. Liu, Bounds on scheduling algorithms for heterogeneous computing systems, Technical Report UIUCDCS-R-74–632, Dept. of Computer Science, University of Illinois at Urbana-Champaign, 1974.

    Google Scholar 

  83. E. L. Lawler, J. Labetoulle, Preemptive scheduling of unrelated parallel processors by linear programming, J. Assoc. Comput. Mach. 25, 1978, 612–619.

    Google Scholar 

  84. J. W. S. Liu, K. J. Lin, C. L. Liu, A position paper for the IEEE Workshop on real-time operating systems, Cambridge, Mass, 1987.

    Google Scholar 

  85. J. Lageweg, J. K. Lenstra, E. L. Lawler, A. H. G. Rinnooy Kan, Computer aided complexity classification of combinatorial problems, Comm. ACM 25, 1982, 817–822.

    Google Scholar 

  86. J. Labetoulle, E. L. Lawler, J. K. Lenstra, A. H. G. Rinnooy Kan, Preemptive scheduling of uniform processors subject to release dates, in: W. R. Pulley-blank (ed.), Progress in Combinatorial Optimization, Academic Press, New York, 1984, 245–261.

    Google Scholar 

  87. E. L. Lawler, J. K. Lenstra, A. H. G. Rinnooy Kan, Recent developments in deterministic sequencing and scheduling: a survey, in M. A. H. Dempster, J. K. Lenstra, A. H. G. Rinnooy Kan (eds.), Deterministic and Stochastic Scheduling, Reidel, Dordrecht, 1982, 35–73.

    Google Scholar 

  88. E. L. Lawler, J. K. Lenstra, A. H. G. Rinnooy Kan, D. B. Shmoys, Sequencing and scheduling: Algorithms and complexity, in: S. C. Graves, A. H. G. Rinnooy Kan, P. H. Zipkin (eds.), Handbook in Operations Research and Man- agement Science, Vol. 4: Logistics of Production and Inventory, Elsevier, Amsterdam, 1993.

    Google Scholar 

  89. J. W. S. Liu, K. J. Lin, W. K. Shih, A. C. Yu, J. Y. Chung, W. Zhao, Algorithms for scheduling imprecise computations, in: A. M. Van Tilborg, G. M. Koob (eds.) Foundations of Real-Time Computing: Scheduling and Resource Management, Kluwer, Boston, 1991.

    Google Scholar 

  90. K. J. Lin, S. Natarajan, J. W. S. Liu, Imprecise results: utilizing partial com-putations in real-time systems, Proc. of the IEEE 8th Real-Time Systems Symposium, San Jose, California, 1987.

    Google Scholar 

  91. J. K. Lenstra, A. H. G. Rinnooy Kan, Complexity of scheduling under precedence constraints, Oper. Res. 26, 1978, 22–35.

    Google Scholar 

  92. J. K. Lenstra, A. H. G. Rinnooy Kan, Scheduling theory since 1981: an annotated bibliography, in: M. O’h Eigearthaigh, J. K. Lenstra, A. H. G. Rinnooy Kan (eds.), Combinatorial Optimization: Annotated Bibliographies, J. Wiley, Chichester, 1984.

    Google Scholar 

  93. G. Schmidt, Scheduling independent tasks with deadlines on semi-identical processors, J. Oper. Res. Soc. 39, 1988, 271–277.

    Google Scholar 

  94. J. K. Lenstra, A. H. G. Rinnooy Kan, P. Brucker, Complexity of processor scheduling problems, Ann. Discrete Math. 1, 1977, 343–362.

    Google Scholar 

  95. S. Lam, R. Sethi, Worst case analysis of two scheduling algorithms, SIAM J. Comput. 6, 1977, 518–536.

    Google Scholar 

  96. R. Muntz, E. G. Coffman, Jr., Optimal preemptive scheduling on two processor systems, IEEE Trans. Comput. C-18, 1969, 1014–1029.

    Google Scholar 

  97. R. Muntz, E. G. Coffman, Jr., Preemptive scheduling of real time tasks on multiprocessor systems, J. Assoc. Comput. Mach. 17, 1970, 324–338.

    Google Scholar 

  98. R. McNaughton, Scheduling with deadlines and loss functions, Management Sci. 6, 1959, 1–12.

    Google Scholar 

  99. K. Nakajima, J. Y-T. Leung, S. L. Hakimi, Optimal two processor scheduling of tree precedence constrained tasks with two execution times, Performance Evaluation 1, 1981, 320–330.

    Google Scholar 

  100. J. B. Orlin, A faster strongly polynomial minimum cost flow algorithm, Proc.20th ACM Symposium on the Theory of Computing, 1988, 377–387.

    Google Scholar 

  101. M. Pattloch, G. Schmidt, Lotsize scheduling of two job types on identical processors, Discrete Appl. Math., 1996, 409–419.

    Google Scholar 

  102. C. N. Potts, L. N. Van Wassenhove, Single processor scheduling to minimize total late work, Report 8938/A, Econometric Institute,Erasmus University, Rotterdam, 1989.

    Google Scholar 

  103. C. N. Potts, L. N. Van Wassenhove, Approximation algorithms for scheduling a single processor to minimize total late work, Oper. Res. Lett. 11, 1992, 261–266.

    Google Scholar 

  104. A. H. G. Rinnooy Kan, Processor Scheduling Problems: Classification, Complexity and Computations, Nijhoff, The Hague, 1978.

    Google Scholar 

  105. C. V. Ramamoorthy, M. J. Gonzalez, A survey of techniques for recognizing parallel processable streams in computer programs, AFIPS Conference Proceedings, Fall Joint Computer Conference, 1969, 1–15.

    Google Scholar 

  106. P. Rosenfeld, unpublished result. Rot66 M. H. Rothkopf, Scheduling independent tasks on parallel processors, Management Sci. 12, 1966, 347–447.

    Google Scholar 

  107. H. Röck, G. Schmidt, Processor aggregation heuristics in shop scheduling, Methods Oper. Res. 45, 1983, 303–314.

    Google Scholar 

  108. S. Sahni, Preemptive scheduling with due dates, Oper. Res. 5, 1979, 925–934.

    Google Scholar 

  109. S. Sahni, Y. Cho, Scheduling independent tasks with due times on a uniform processor system, J. Assoc. Comput. Mach. 27, 1980, 550–563.

    Google Scholar 

  110. G. Schmidt, Scheduling on semi-identical processors, ZOR A28, 1984, 153–162.

    Google Scholar 

  111. R. Sethi, Chapter 2 in: E. G. Coffman, Jr. (ed.), Scheduling in Computer and Job Shop Systems, J. Wiley, New York, 1976.

    Google Scholar 

  112. R. Sethi, On the complexity of mean flow time scheduling, Math. Oper. Res. 2, 1977, 320–330.

    Google Scholar 

  113. S. V. Sevastjanov, Private communication, 1991.

    Google Scholar 

  114. R. Slowifiski, Scheduling preemptible tasks on unrelated processors with additional resources to minimise schedule length, in G. Bracci, R. C. Lockemann (eds.), Lecture Notes in Computer Science, vol. 65, Springer, Berlin, 1978, 536–547.

    Google Scholar 

  115. R. Síowifiski, J. Wgglarz, Minimalno-czasowy model sieciowy z róznymi sposobami wykonywania czynnosci, Przeglad Statystyczny 24, 1977, 409–416.

    Google Scholar 

  116. J. D. Ullman, Chapter 4 in: E. G. Coffman, Jr. (ed.), Scheduling in Computer and Job Shop Systems, J. Wiley, New York, 1976.

    Google Scholar 

  117. J. Wgglarz, J. Blazewicz, W. Cellary, R. Slowinski, An automatic revised simplex method for constrained resource network scheduling, ACM Trans. Math. Software 3, 1977, 295–300.

    Google Scholar 

  118. D. de Werra, Preemptive scheduling linear programming and network flows, SIAM J. Algebra Discrete Math. 5, 1984, 11–20.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2001 Springer-Verlag Berlin Heidelberg

About this chapter

Cite this chapter

Błażewicz, J., Ecker, K.H., Pesch, E., Schmidt, G., Węglarz, J. (2001). Scheduling on Parallel Processors. In: Scheduling Computer and Manufacturing Processes. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-662-04363-9_5

Download citation

  • DOI: https://doi.org/10.1007/978-3-662-04363-9_5

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-07545-2

  • Online ISBN: 978-3-662-04363-9

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics