Abstract
Let us summarize the major contributions for computationally minimizing walking time at moving assembly lines in two groups: optimization of (a) the sequence of assembly operations, and (b) the line side placement of parts.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsAuthor information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2020 Springer Fachmedien Wiesbaden GmbH, part of Springer Nature
About this chapter
Cite this chapter
Sedding, H.A. (2020). Summary of major contributions. In: Time-Dependent Path Scheduling. Springer Vieweg, Wiesbaden. https://doi.org/10.1007/978-3-658-28415-2_8
Download citation
DOI: https://doi.org/10.1007/978-3-658-28415-2_8
Published:
Publisher Name: Springer Vieweg, Wiesbaden
Print ISBN: 978-3-658-28414-5
Online ISBN: 978-3-658-28415-2
eBook Packages: Computer ScienceComputer Science (R0)