Abstract
Grid integration of decentral power generation units and storage systems as well as new requirements from the „Network Code on Requirements for Grid Connection of Generators“ (NC RfG) by the European Unionlead to new grid codes in all countries of the EU. In Germany the VDE „Association for Electrical, Electronic & Information Technologies“ will publish new grid requirements for power generating facilities and storage systems in the next two years. The grid codes for all valtage levels from low valtage to ultrahigh valtage are being revised at the moment. It is expected that the first public draft of the medium valtage level grid code (VDE-AR-N 4110) will be available in autumn 2016. This medium valtage grid code uses concepts ofthe latest public high valtage grid code VDE-AR-N 4120 which will be amended itself according to the requirements from the NC RfG. In a further step the test and certification requirements will be updated in Germany by the FGW. This paper provides an overview on the current status of the grid code requirements and the test, simulation and certification guidelines in Germany.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2017 Springer Fachmedien Wiesbaden GmbH
About this paper
Cite this paper
Scheben, F., Genzmer, K., Mohrdieck, JM., Möller, J. (2017). Status of the National Implementation of the NC RfG in Germany. In: Schulz, D. (eds) NEIS Conference 2016. Springer Vieweg, Wiesbaden. https://doi.org/10.1007/978-3-658-15029-7_15
Download citation
DOI: https://doi.org/10.1007/978-3-658-15029-7_15
Publisher Name: Springer Vieweg, Wiesbaden
Print ISBN: 978-3-658-15028-0
Online ISBN: 978-3-658-15029-7
eBook Packages: Computer Science and Engineering (German Language)