Turnkey Model Contracts for Major Industrial Plant Projects (MIPP)

  • Anita Erbe
Chapter
Part of the Baubetriebswirtschaftslehre und Infrastrukturmanagement book series (BAUBWL)

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Brockmann, C. (2009): Global construction markets and contractors, in: Ruddock, L. (ed.) Economics for the modern built environment, pp. 168–98, London; New York: Taylor & Francis.Google Scholar
  2. ENAA (2010): Guide Notes to the 2010 Edition of the Model Form International Contract for Process Plant Construction, Tokyo: ENAA.Google Scholar
  3. ENAA (2014): ENAA Contract Model Forms, http://bit.ly/RvQy73.
  4. Erbe, A. (2013): Evaluating main order contract forms for Major Industrial Plant Projects (MIPP) with respect to completion and performance of design risk allocation, Freiberg Working Papers: 1–25.Google Scholar
  5. Erbe, A. (2014): Cost Estimate Classification and Accuracy for Major Industrial Plant Projects (MIPP) versus Building Construction in Germany, Freiberg Working Papers: 1–18.Google Scholar
  6. FIDIC (1999): Conditions of Contract for EPC/Turnkey Projects: General conditions: Guidance for the preparation of particular conditions: Forms of letter of tender, contract agreement and dispute adjudication agreement, Geneva.Google Scholar
  7. FIDIC (2014): FIDIC Member Associations & Associates, http://fidic.org/members.
  8. ICC (2003): ICC model contract for the turnkey supply of an industrial plant, Paris: ICC Pub. S.A.Google Scholar
  9. ICC (2013): ICC Store: Model Contracts/ICC Model Contract for the Turnkey Supply of an Industrial Plant, http://bit.ly/1oAeceL.
  10. ICC (2014): Global Network, http://bit.ly/1mfHhcR.
  11. IChemE (2007): International form of contract: Target Cost Contracts, Rugby: Institution of Chemical Engineers.Google Scholar
  12. Jacob, D./ Stuhr, C./ Winter, C. (2011): Kalkulieren im Ingenieurbau: Strategie – Kalkulation – Controlling, Wiesbaden: Vieweg + Teubner.Google Scholar
  13. Jaeger, A.V./ Hök, G.-S. (2009): FIDIC: A guide for practitioners, Heidelberg, New York: Springer.Google Scholar
  14. ManagementEngineers and VDMA (eds) (2011): Was macht den Großanlagenbau robust für die Zukunft? – Erfolgsfaktor Wettbewerbsfähigkeit, Düsseldorf, Frankfurt.Google Scholar
  15. Orgalime (March 2003): Turnkey Contract for Industrial Works: Four Separate Documents: Introduction, General Conditions, Main Contract Document, Checklist, Brussels.Google Scholar
  16. Orgalime (2013): Speaking for European Engineering: Annual Report 2012-13, Brussels.Google Scholar
  17. Widmann, A.J. (1977): Handbuch des Investitionsgüter- und Industrieanlagen-Exports, München: Verlag Moderne Industrie.Google Scholar
  18. Yescombe, E.R. (2002): Principles of project finance, Amsterdam; Boston: Academic Press.Google Scholar

Copyright information

© Springer Fachmedien Wiesbaden 2015

Authors and Affiliations

  • Anita Erbe
    • 1
  1. 1.Technischen Universität Bergakademie FreibergFreibergDeutschland

Personalised recommendations