Turnkey Model Contracts for Major Industrial Plant Projects (MIPP)

  • Chapter
  • First Online:
  • 4030 Accesses

Part of the book series: Baubetriebswirtschaftslehre und Infrastrukturmanagement ((BAUBWL))

Abstract

Major Industrial Plant Projects, abbreviated MIPP in the following, are large engineering projects. A MIPP is characterized by the following features (c.f. Erbe 2013: 3-6; 2014: 6): It involves planning and realizing (but not operating) an industrial process plant. It is a “Greenfield” investment requiring a Total Investment Cost (TIC) of a minimum of USD 100 million. TIC, for purposes of simplification, is understood to include the Engineering, Procurement and Construction (EPC) of a process plant. TIC comprises process engineering and equipment of over 50 %, typically 65-75 %, which, in simplified terms, represents the Engineering and Procurement (EP) part of the project. The remaining percentage of TIC is the Construction (C) part.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   89.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD   119.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  • Brockmann, C. (2009): Global construction markets and contractors, in: Ruddock, L. (ed.) Economics for the modern built environment, pp. 168–98, London; New York: Taylor & Francis.

    Google Scholar 

  • ENAA (2010): Guide Notes to the 2010 Edition of the Model Form International Contract for Process Plant Construction, Tokyo: ENAA.

    Google Scholar 

  • ENAA (2014): ENAA Contract Model Forms, http://bit.ly/RvQy73.

  • Erbe, A. (2013): Evaluating main order contract forms for Major Industrial Plant Projects (MIPP) with respect to completion and performance of design risk allocation, Freiberg Working Papers: 1–25.

    Google Scholar 

  • Erbe, A. (2014): Cost Estimate Classification and Accuracy for Major Industrial Plant Projects (MIPP) versus Building Construction in Germany, Freiberg Working Papers: 1–18.

    Google Scholar 

  • FIDIC (1999): Conditions of Contract for EPC/Turnkey Projects: General conditions: Guidance for the preparation of particular conditions: Forms of letter of tender, contract agreement and dispute adjudication agreement, Geneva.

    Google Scholar 

  • FIDIC (2014): FIDIC Member Associations & Associates, http://fidic.org/members.

  • ICC (2003): ICC model contract for the turnkey supply of an industrial plant, Paris: ICC Pub. S.A.

    Google Scholar 

  • ICC (2013): ICC Store: Model Contracts/ICC Model Contract for the Turnkey Supply of an Industrial Plant, http://bit.ly/1oAeceL.

  • ICC (2014): Global Network, http://bit.ly/1mfHhcR.

  • IChemE (2007): International form of contract: Target Cost Contracts, Rugby: Institution of Chemical Engineers.

    Google Scholar 

  • Jacob, D./ Stuhr, C./ Winter, C. (2011): Kalkulieren im Ingenieurbau: Strategie – Kalkulation – Controlling, Wiesbaden: Vieweg + Teubner.

    Google Scholar 

  • Jaeger, A.V./ Hök, G.-S. (2009): FIDIC: A guide for practitioners, Heidelberg, New York: Springer.

    Google Scholar 

  • ManagementEngineers and VDMA (eds) (2011): Was macht den Großanlagenbau robust für die Zukunft? – Erfolgsfaktor Wettbewerbsfähigkeit, Düsseldorf, Frankfurt.

    Google Scholar 

  • Orgalime (March 2003): Turnkey Contract for Industrial Works: Four Separate Documents: Introduction, General Conditions, Main Contract Document, Checklist, Brussels.

    Google Scholar 

  • Orgalime (2013): Speaking for European Engineering: Annual Report 2012-13, Brussels.

    Google Scholar 

  • Widmann, A.J. (1977): Handbuch des Investitionsgüter- und Industrieanlagen-Exports, München: Verlag Moderne Industrie.

    Google Scholar 

  • Yescombe, E.R. (2002): Principles of project finance, Amsterdam; Boston: Academic Press.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2015 Springer Fachmedien Wiesbaden

About this chapter

Cite this chapter

Erbe, A. (2015). Turnkey Model Contracts for Major Industrial Plant Projects (MIPP). In: Kessel, T., Gawlitta, M., Hilbig, C., Walther, M. (eds) Aspekte der Baubetriebslehre in Forschung und Praxis. Baubetriebswirtschaftslehre und Infrastrukturmanagement. Springer Gabler, Wiesbaden. https://doi.org/10.1007/978-3-658-09359-4_4

Download citation

  • DOI: https://doi.org/10.1007/978-3-658-09359-4_4

  • Published:

  • Publisher Name: Springer Gabler, Wiesbaden

  • Print ISBN: 978-3-658-09358-7

  • Online ISBN: 978-3-658-09359-4

  • eBook Packages: Business and Economics (German Language)

Publish with us

Policies and ethics