Abstract
An important factor within Europe’s development process is the transportation system. The completion of the Pan-European corridors, as set in the early 90-ies, is also based on Romania’s motorway and railway system. Therefore investments in Romania’s transportation infrastructure are made. “Design and build” projects allow the implementation of efficient, economical and also modern structures. In case of the Orăştie – Sibiu, lot 1 motorway section, with a length of 24,110 km, all bridges, summing 27 structures, are build using innovative and modern concepts. Twenty six of the bridges are integral structures with lengths up to 96,00 m, some of them in obliquity and 1 bridge is semi-integral having a length of 240,00 m. The present paper presents a quick overview of these structures and the chosen technical solutions: prestressed concrete girders with efficient material use - BFT®, prefabricated composite girders with composite dowels – VFT®, box bridges with precast slabs.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
[Seidl 2011] Seidl, G, et alt.: Prefabricated enduring composite beams based on innovative shear transmission, Final Report RFSR-CT-2006-00030, s.l.: European Commission, 2011.
[EcoBridge] RFCS research project 2010. ECOBRIDGE: Demonstration of economical bridge solutions based on innovative composite dowels and integrated abutment, Grant no. RFSP-CT-2010–00024.
[Petzek, Băncilă & Schmitt] Petzek, E., Băncilă R., Schmitt V.: Romanian experience in new efficient solutions for composite bridges, Eurosteel 2011 Budapest, 978-954-724-014-5, 2011.
[s.c. SSF-RO s.r.l] s.c. SSF-RO s.r.l.: Project 11-1024, Bridges design of the Orăştie-Sibiu, lot 1 km 0,000-24,110, Motorway section.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2014 Springer Fachmedien Wiesbaden
About this paper
Cite this paper
Petzek, E., Meteş, E., Toma, L., Schmitt, V. (2014). New Integral Bridges Solutions for the Romanian Motorway. In: Petzek, E., Bancila, R. (eds) The Eight International Conference "Bridges in Danube Basin". Springer Vieweg, Wiesbaden. https://doi.org/10.1007/978-3-658-03714-7_25
Download citation
DOI: https://doi.org/10.1007/978-3-658-03714-7_25
Published:
Publisher Name: Springer Vieweg, Wiesbaden
Print ISBN: 978-3-658-03713-0
Online ISBN: 978-3-658-03714-7
eBook Packages: EngineeringEngineering (R0)