Abstract
In 2010 PORR Bau GmbH received a FIDIC Red Book contract to build the north approach ramps (NAR) and a FIDIC Yellow Book contract to design and build the south approach ramps (SAR) to Sava Bridge. The paper gives an introduction into both projects and describes design and execution challenges. In particular design changes are described and their benefit for Investor and Contractor considering the different contractual basis.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2014 Springer Fachmedien Wiesbaden
About this paper
Cite this paper
Steinkühler, M. (2014). The Approach Bridges for Sava Crossing in Belgrade, Serbia – Design And Redesign under Fidic Red Book And Yellow Book. In: Petzek, E., Bancila, R. (eds) The Eight International Conference "Bridges in Danube Basin". Springer Vieweg, Wiesbaden. https://doi.org/10.1007/978-3-658-03714-7_12
Download citation
DOI: https://doi.org/10.1007/978-3-658-03714-7_12
Published:
Publisher Name: Springer Vieweg, Wiesbaden
Print ISBN: 978-3-658-03713-0
Online ISBN: 978-3-658-03714-7
eBook Packages: EngineeringEngineering (R0)