Summary and Outlook

Chapter
Part of the Produktion und Logistik book series (PL)

Abstract

In the consumer packaged goods industry, usually a large number of final items is produced in a two- or three-stage flow line production system with heterogeneous, parallel production lines at each stage. Due to sequence-dependent setup times and costs a simultaneous lotsizing and scheduling of the bottleneck stage is necessary.

Keywords

Production Line 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Springer Fachmedien Wiesbaden 2013

Authors and Affiliations

  1. 1.DarmstadtGermany

Personalised recommendations