Advertisement

Summary and Outlook

  • Florian Seeanner
Chapter
Part of the Produktion und Logistik book series (PL)

Abstract

In the consumer packaged goods industry, usually a large number of final items is produced in a two- or three-stage flow line production system with heterogeneous, parallel production lines at each stage. Due to sequence-dependent setup times and costs a simultaneous lotsizing and scheduling of the bottleneck stage is necessary.

Keywords

Travel Salesman Problem Valid Inequality Vehicle Route Problem Construction Heuristic Improvement Heuristic 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Springer Fachmedien Wiesbaden 2013

Authors and Affiliations

  1. 1.DarmstadtGermany

Personalised recommendations