Skip to main content

Part of the book series: IPA — Forschung und Praxis ((IPA,volume 38))

  • 34 Accesses

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 54.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 69.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Literatur

  1. Warnecke, H.J.; Bullinger, H.J.; Lienert, J.:Ausgewählte EDV-Anwendungen im Produktionsbereich in: Plötzeneder, H.D. (Hrsg.) Wirtschaftsinformatik III. UTB-Reihe Wirtschaftswissenschaften Gustav Fischer Verlag Stuttgart — New York erscheint 1979

    Google Scholar 

  2. Dolezalek, C.M.; Ropohl, G.:Die flexible Fertigungslinie und ihre Bedeutung für die Automatisierung der Serienfertigung.VDI-Z. 108 (1966) H. 26, S. 1261–1268

    Google Scholar 

  3. Stute, G.:Flexible Fertigungssysteme wt-Z.ind. Fertig. 64 (1974) Nr. 3, S. 147–156

    Google Scholar 

  4. Graf, H.:Methodenauswahl für die Materialbewirtschaftung in Maschinenbau-Betrieben. Diss. Universität Stuttgart, 1977

    Google Scholar 

  5. Bey, I.:Rechnergeführte Prozesse: Analyse, Synthese, Anwendung. Vortragsmanuskript zum Projektbericht PDV, Karlsruhe 1974

    Google Scholar 

  6. Scharf, P.; Schulz, E.:Integrierte flexible Fertigungssysteme.wt-Z. ind.Fertig. 63 (1973) H. 3, S. 130–136 und H. 4, S. 199–206

    Google Scholar 

  7. N.N.Der gegenwärtige Status Quo der Japanischen Technologie für Gruppensteuerungssysteme von Werkzeugmaschinen. Japan todays machine tool industry (1973) S. 46–55

    Google Scholar 

  8. Horrmann, D.: Betrieb rechnergesteuerter Fertigungssysteme. Dissertation TH Aachen, 1973

    Google Scholar 

  9. Lueg, H.; Moll, W.P.: Maschinenbelegung mit EDV.Werkzeugmaschine International 3 (1973) H. 4, S. 55–67

    Google Scholar 

  10. Pätzold, A.: Rechnergeführte Fertigung, ein Schlüssel zur Automatisierung des Fertigungsablaufs.ZwF (1975) H. 8, S. 415–419

    Google Scholar 

  11. Moll, W.P.: Maschinenbelegung mit EDV.Dissertation Universität Stuttgart 1975

    Google Scholar 

  12. Kunerth, W.: Technisch-organisatorische Informationssysteme. Vorlesungsmanuskript Universität Stuttgart

    Google Scholar 

  13. Heinemayer, W.: Analyse der Fertigungsdurchlaufzeit im Industriebetrieb. Dissertation TU Hannover 1974

    Google Scholar 

  14. Roy, B.: Ablaufplanung.München, Wien 1968

    Google Scholar 

  15. Hoch, P.: Betriebswirtschaftliche Methoden und Zielkriterien der Reihenfolgeplanung bei Werkstatt-und Gruppenfertigung. Verlag Harri Deutsch, Frankfurt/M. Zürich 1973

    Google Scholar 

  16. Conway, R.W.; Maxwell, W.L.; Miller, L.W.: Theory of Scheduling.Reading, Mass., Pale Alto, London, Don Mills, Okt. 1967

    Google Scholar 

  17. Günther, H.:Das Dilemma der Arbeitsablaufplanung. Betriebswirtschaftliche Studien, Bd. 10, 1971

    Google Scholar 

  18. Dickhut, G.H.:Zur Problematik der optimalen Fertigungsablaufplanung in der Einzel-und Kleinserienfertigung. Dissertation TH Aachen 1966

    Google Scholar 

  19. Berr, U.; Papendieck, A.J.: Produktionsreihenfolgen und LosgröBen.Werkstattstechnik 60 (1970) H. 4, S. 191–196

    Google Scholar 

  20. Sankaran, D.: Zur Lösung des Zuordnungsproblems in der Fertigungstechnik mit Hilfe pseudoboolscher Algebra. Dissertation TU Hannover, 1973

    Google Scholar 

  21. Bittner, H.:Heuristische Verfahren zur Ablaufplanung von Fertigungsprozessen bei Einzel-und Kleinserienfertigung. Fertigungstechnik und Betrieb 26 (1976) H. 1, S. 14–17

    Google Scholar 

  22. Niemeyer, G.:Die Simulation von Systemabläufen mit Hilfe von FORTRAN IV. GPSS auf FORTRAN-Basis. Verlag waiter de Gruyter, Berlin, New York, 1972

    Google Scholar 

  23. N.N.: Kapazitätsterminierung für Fertigungsbetriebe. IBM-Form 71 423–1

    Google Scholar 

  24. Jackson, J.R.:Networks of Waiting lines. Operations Research, Vol. 5, 1957, S. 518–521

    Article  MathSciNet  Google Scholar 

  25. Hoss, K.:Fertigungsablaufplanung mittels operationsanalytischer Methoden. Würzburg, Wien 1965

    Google Scholar 

  26. Keck, H.: Vergleich von Prioritätsregeln mit Hilfe der Simulation. in: Bussmann/Mertens:Operation Research und Datenverarbeitung bei der Produktionsplanung. S. 230–251, Stuttgart 1968

    Google Scholar 

  27. Moore, J.M.; Wilson, R.C.: A Review in Simulation Research in Job Shop Scheduling in: Production and Inventory Management, S.1–10, 1967

    Google Scholar 

  28. Allen, M.: The efficient Utilization of Labor under Conditions of Fluctuating Demand.in: Industrial Scheduling, 1963, S. 252–276

    Google Scholar 

  29. Hollier, R.H.: A Simulation Study of Sequencing in Batch Productions. in: Operation Research, Quart. 19, 1968, S. 389–407

    Google Scholar 

  30. Nelson, R.H.: Labor and Machine Limited Production Systems. Management Science, Vol. 13, Nr. 9, 1967, S.389–407

    Google Scholar 

  31. Kanodia, L.S.:Queue Balancing - Another Approach to the Theorie of Scheduling.M.S. Thesis, MIT, A.P. Sloan School of Management 1965

    Google Scholar 

  32. Russo, F.J.:A Heuristic Approach to alternative Routing in a Job Shop.M.S. Thesis, MIT, 1965

    Google Scholar 

  33. Carrol, D.C.:Heuristic Sequencing of Single and Multiple Component Jobs. PhD Thesis, MIT, A.P. Sloan School of Management 1965

    Google Scholar 

  34. Ropohl, G.: Flexible Fertigungssysteme. Verlag Krausskopf, Mainz 1971

    Google Scholar 

  35. Dathe, H.M.: Moderne Projektionsplanung in Technik und Wissenschaft Hanser-Verlag, München, 1971

    Google Scholar 

  36. Simon, W.: Produktivitätsverbesserung mit NC-Maschinen und Computern.Hanser-Verlag, München 1969

    Google Scholar 

  37. Glantschnig, F.:Flexibilität bei zunehmender Automation in der Fertigung.Industrielle Organisation 41 (1972) 5, S. 227–235

    Google Scholar 

  38. Egger, A.:Kurzfristige Fertigungsplanung und betriebliche Elastizität.Berlin 1971

    Google Scholar 

  39. Phillip, R.:Die Planung flexibler Produktionssysteme. ZwF 68 (1973) 11, S. 632–637

    Google Scholar 

  40. Scharf, P.: Strukturalternativen integrierter, flexibler Fertigungssysteme und ihre Bewertung.Dissertation Universität Stuttgart 1974

    Google Scholar 

  41. Junghanns, W.: Planung neuer Fertigungssysteme für die Einzel-und Serienfertigung.Dissertation TH Aachen, 1971

    Google Scholar 

  42. Giuliani, O.; Maier, U.; NieB, P.S.: ATEX - Ein TermInierûngsprogramm für flexible Fertigungssysteme.VDI-Z 117 (1975) Nr. 20, S. 947–952

    Google Scholar 

  43. Winkler, J.F.H.; u.a.: Rahmenkonzeption “Flexible Fertigungssysteme” PDV-Entwicklungsnotizen, Karlsruhe 1974

    Google Scholar 

  44. Warnecke, H.J.; Giuliani, O.; Maier, U.; NieB, P.S.: Fertigungssteuerung bei flexiblen Fertigungssystemen. wt-Z.ind.Fertig. 65 (1974), S. 440–447

    Google Scholar 

  45. Spur, G.; Feldmann, K.; Matthes, H.: Entwicklungstand integrierter Fertigungssysteme ZwF 68 (1974) 5, S. 229–235

    Google Scholar 

  46. Warnecke, H.J.; Maier, U.:Kurzfristige Kapazitätsterminierung bei flexiblen Fertigungssystemen auf der Basis variabel aufgebauter Arbeitspläne. Vortragsmanuskript, 7th CIRP-Seminar on Manufacturing Systems, Eindhoven 1975

    Google Scholar 

  47. RuoB, G.:Beitrag zur Fertigungssteuerung bei flexiblen Fertigungssystemen. Diplomarbeit am IFF 1973

    Google Scholar 

  48. NieB, P.S.:Fertigungssteuerung im flexiblen Fertigungssystem unter besonderer Berücksichtigung des Kapazitätsabgleichs. Dissertation Universität Stuttgart 1979

    Google Scholar 

  49. Mellerowicz, K.:Betriebswirtschaftslehre der Industrie. 2. Band, 5. Aufl. Freiburg i.Br. 1958

    Google Scholar 

  50. Heinen, E.:Das Zielsystem der Unternehmung, Grundlage betriebswirtschaftlicher Entscheidungen. Wiesbaden 1966

    Google Scholar 

  51. Neimeier, H.A.: An Investigation of Alternative Routing in a Job Shop. M.S. Thesis Cornell University, 1965

    Google Scholar 

  52. Wayson, R.D.: The Effect of alternative Machines on Two Priority Dispatching Disciplines in the General Job Shops. M.S. Thesis Cornell University, 1965

    Google Scholar 

  53. Clermont, P.: Maschine Substitution in a Job Shop M.S. Thesis, A.P. Sloan School of Management, MIT 1966

    Google Scholar 

  54. Maier, U.; NieB, P.S.: Planungsmethoden der Fertigungssteuerung bei flexiblen Fertigungssystemen. HGF-Kurzbericht 75/73 in Industrie-Anzeiger 97, Nr. 82, 1975

    Google Scholar 

  55. Biermann, J.; Maier, U.: Terminierungsmethoden für flexible Fertigungssysteme auf der Basis variabel aufgebauter Arbeitsplätze. FB/IE 25 (1976) H. 1, S. 37–42

    Google Scholar 

  56. Wilhelm, R.; Döttling, W.: Auslegung des Materialflusses eines flexiblen Fertigungssystems.wt-Z.ind.Fertig. 66 (1976) 1, S. 25–29

    Google Scholar 

  57. Wilhelm, R.: Analyse flexibler Fertigungssysteme. wt-Z.ind.Fertig. 66 (1976) 9, S. 529–536

    Google Scholar 

  58. Gutenberg, E.:Grundlagen der Betriebswirtschaftslehre. 1. Band: Die Produktion. Berlin-Heidelberg-New York, 1965

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 1980 Springer-Verlag, Berlin, Heidelberg

About this chapter

Cite this chapter

Maier, U. (1980). Literatur. In: Arbeitsgangterminierung mit variabel strukturierten Arbeitsplänen. IPA — Forschung und Praxis, vol 38. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-81508-9_9

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-81508-9_9

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-540-10213-7

  • Online ISBN: 978-3-642-81508-9

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics