Skip to main content

Engineering Surveys for Construction of the Ems Tunnel

  • Conference paper
Applications of Geodesy to Engineering

Part of the book series: International Association of Geodesy Symposia ((IAG SYMPOSIA,volume 108))

  • 300 Accesses

Abstract

The new motorway tunnel under the Ems was created between 1985 and 1989 by the Immersed Tube Method. An account is given below of finished construction, basic geodetic surveys, measurement during construction and examining survey after completion. For the project five tunnel elements prefabricated in a dredged dock, each 127,5m long, had to be set across the Ems and lowered one after the other into position. This necessitated continual, accurate supervision of position, height, and inclination of each tunnel element.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  • Diehl, W. (1988): Zur Zuverlässigkeit in geodätischen Lagenetzen, Technische Universität, Dissertation FB 7, Berlin.

    Google Scholar 

  • Förstner, W. (1979): Das Rechenprogramm TRINA für geodätische Lagenetze in der Landesvermessung. NÖV-NRW 1979, S.125.

    Google Scholar 

  • Linder, B.-U. (1986): Die Grundlagenvermessungen für den Bau des Emstunnels bei Leer. ZfV 1986, S.224.

    Google Scholar 

  • Linder, B.-U. (1988): Die Vermessungsarbeiten für das Einschwimmen und Absenken des BAB-Emstunnels bei Leer. AVN 1988, S.281.

    Google Scholar 

  • Wolf, D. (1979): Kontroll- und Beweissicherungsvermessungen nach Rohbaufertigstellung und Inbetriebnahme des BAB-Elbtunnels. AVN 1979, S.324.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 1993 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Linder, BU. (1993). Engineering Surveys for Construction of the Ems Tunnel. In: Linkwitz, K., Eisele, V., Mönicke, HJ. (eds) Applications of Geodesy to Engineering. International Association of Geodesy Symposia, vol 108. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-77958-9_26

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-77958-9_26

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-540-56233-7

  • Online ISBN: 978-3-642-77958-9

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics