Abstract
The new motorway tunnel under the Ems was created between 1985 and 1989 by the Immersed Tube Method. An account is given below of finished construction, basic geodetic surveys, measurement during construction and examining survey after completion. For the project five tunnel elements prefabricated in a dredged dock, each 127,5m long, had to be set across the Ems and lowered one after the other into position. This necessitated continual, accurate supervision of position, height, and inclination of each tunnel element.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Diehl, W. (1988): Zur Zuverlässigkeit in geodätischen Lagenetzen, Technische Universität, Dissertation FB 7, Berlin.
Förstner, W. (1979): Das Rechenprogramm TRINA für geodätische Lagenetze in der Landesvermessung. NÖV-NRW 1979, S.125.
Linder, B.-U. (1986): Die Grundlagenvermessungen für den Bau des Emstunnels bei Leer. ZfV 1986, S.224.
Linder, B.-U. (1988): Die Vermessungsarbeiten für das Einschwimmen und Absenken des BAB-Emstunnels bei Leer. AVN 1988, S.281.
Wolf, D. (1979): Kontroll- und Beweissicherungsvermessungen nach Rohbaufertigstellung und Inbetriebnahme des BAB-Elbtunnels. AVN 1979, S.324.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 1993 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Linder, BU. (1993). Engineering Surveys for Construction of the Ems Tunnel. In: Linkwitz, K., Eisele, V., Mönicke, HJ. (eds) Applications of Geodesy to Engineering. International Association of Geodesy Symposia, vol 108. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-77958-9_26
Download citation
DOI: https://doi.org/10.1007/978-3-642-77958-9_26
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-56233-7
Online ISBN: 978-3-642-77958-9
eBook Packages: Springer Book Archive