Abstract
The just-in-time (JIT) delivery of products is a considerable challenge for many firms, because suitable planning methods have to be developed and practically installed. One main problem refers to the suppliers’ strategy, as they are no longer able to keep their optimal lot sizes and production rates due to customers’ reduced call-forward rates (cf. e.g. Fandel et al. 1988 and Fandel 1988). Thus, the suppliers have to choose different planning procedures in order to assure that there will be no avoidable in-process costs, as concerns particularly the production, inventory, and transportation of products. Obviously, there exist remarkable trade-offs between the design parameters of the whole process (cf. Reese 1991), which require a simultaneous optimization of all variables.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsPreview
Unable to display preview. Download preview PDF.
References
Binnenbruck, H.-H.: Infomationssysteme für den Güterfernverkehr, in: Deutsche Verkehrswissenschaftliche Gesellschaft (ed.): Probleme und Lösungsansätze der zwischenbetrieblichen Kommunikation im Güterverkehr, Bergisch Gladbach 1986, pp. 32.
Dale, ST.: JIT and its Impact on the Supplier Chain, in: Mortimer, J. (ed.): Just-in-Time, An Executive Briefing, Berlin et al. 1986, pp. 47–49.
Fandel, G.: Auswirkungen der Lieferabrufsysteme in der Automobilindustrie auf die Serienstückkosten der Zulieferer, in: Lücke, W. (ed.): Betriebswirtschaftliche Steuerungs- und Kontrollprobleme, Wiesbaden 1988, pp. 49–62.
Fandel, G., Francois, P., and May, E.: Effects on Call-Forward Delivery Systems on Supplier’s Serial per Unit Costs, in: Fandel, G., Dyckhoff, H., and Reese, J. (eds.): Essays on Production Theory and Planning, Berlin et al. 1988, pp. 66–84.
Grandjot, H.-H.: Kommunikation in der Transportkette - Anforderungen und Probleme, in: Deutsche Verkehrswissenschaftliche Gesellschaft (ed.): Probleme und Lösungsansätze der zwischenbetrieblichen Kommunikation im Güterverkehr, Bergisch Gladbach 1986, pp. 5.
Koll, H.: Just-in-Time, Chancen und Risiken mittelständischer Zulieferunternehmen, in: Mehr Erfolg durch Logistik, Lösungen für die Praxis, Berichtsband über den BVL Logistik- Kongreß’86, Berlin 1986, pp. 35.
Peterson, R., and Silver, E. A.: Decision Systems for Inventory Management and Production Planning, New York et al. 1979.
Reese, J.: Trade-off between Production and Inventory Costs with Respect to a Given Demand Situation, in: Fandel, G., and Zäpfel, G. (eds.): Modern Production Concepts - Theory and Applications -, Berlin et al. 1991, pp. 276–289.
Schulz, R.: Logistik-Anforderungen, Gestaltung logistischer Schnittstellen aus der Sicht eines Unternehmens der Automobilindustrie, in: Zeitschrift für Logistik, 1983, pp. 77–80.
Tempelmeier, H.: Lieferzeit-orientierte Lagerungs- und Auslieferungsplanung, Würzburg - Wien 1983a.
Tempelmeier, H.: Quantitative Marketing-Logistik, Entscheidungsprobleme, Lösungsverfahren, EDV-Programme, Berlin et al. 1983b.
Wildemann, H.: Materialflußorientierte Logistik, in: Zeitschrift für Betriebswirtschaft, Ergänzungsheft 2/1984 „Unternehmensführung und Logistik“, pp. 71–90.
Wildemann, H.: Flexible Fertigungssysteme, in: Zeitschrift für Betriebswirtschaft, 1986, pp. 337–369.
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 1991 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
Fandel, G., Reese, J. (1991). Hierarchical Planning for Just-in-Time Deliveries. In: Fandel, G., Gehring, H. (eds) Operations Research. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-76537-7_26
Download citation
DOI: https://doi.org/10.1007/978-3-642-76537-7_26
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-76539-1
Online ISBN: 978-3-642-76537-7
eBook Packages: Springer Book Archive