Abstract
The concern Mitsubishi Electric, Tokio decided in 1989 to build a factory for semiconductors. After intensive proofment of severall locations, Alsdorf was chosen for building a new factory: Mitsubishi Semiconductor Europe GmbH (MSE). The factory is situated on a area of 11,8 ha north of Hoengen, rihgt near the highway A44 between Aachen and Düren, at the „Industrial — park Alsdorf“. Mitsubishi is the first factory in this area. After building — from middle 1990 till end 1991- the production machines were installed. In the middle of 1992 they began with series production of semiconductors.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 1997 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Kobayashi, H. (1997). Chip Design at Mitsubishi Semiconductor Europe GmbH. In: Jarke, M., Pasedach, K., Pohl, K. (eds) Informatik ’97 Informatik als Innovationsmotor. Informatik aktuell. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-60831-5_51
Download citation
DOI: https://doi.org/10.1007/978-3-642-60831-5_51
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-63066-1
Online ISBN: 978-3-642-60831-5
eBook Packages: Springer Book Archive