Abstract
The net present value is widely regarded as the main financial criterion for evaluating the return on assets and profitability of large scaled projects. Considering activity-on-arc networks, the positive and negative cash flows that occur throughout the project lifetime are associated with the completion of activities. Emphasizing the financial aspects of project management, the activities of the project have to be scheduled such that the net present value of the project is maximized and all temporal and resource constraints are met. For solving the resource unconstrained case, we consider an exact solution procedure based on a first-order steepest ascent approach where the ascent direction is normalized by the supremum norm. Using the concept of minimal delaying modes, we device a branch-and-bound procedure for solving the resource-constrained project scheduling problem with discounted cash flows where we use a dual method to solve the resource relaxation in each node of the enumeration tree. To speed up the procedure preprocessing, immediate selection and a generalized subset dominance rule are used. An experimental performance analysis shows that the proposed algorithms clearly outperforms the procedures proposed in the open literature.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Similar content being viewed by others
References
Bartusch M., Möhring R.H., Radermacher F.J. (1988): Scheduling project networks with resource constraints and time windows, Annals of Operations Research 16, 201–240.
De Reyck B. (1998): Scheduling projects with generalized precedence relations: exact and heuristic procedures, Ph. D. Dissertation, Catholic University of Leuven.
De Reyck B., Herroelen W. (1998): An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations, Computers and Operations Research 25, 1–17.
Herroelen W.S., Van Dommelen P., Demeulemeester E.L. (1997): Project network models with discounted cash flows: a guided tour through recent developments, European Journal of Operational Research 100, 97–121.
Grinold R.C. (1972): The payment scheduling problem, Naval Research Logistics Quarterly 19, 123–136.
Kamburowski J. (1990): Maximizing the project net present value in activity networks under generalized precedence relations, Proceedings of 21st DSI Annual Meeting, San Diego, 748–750.
Neumann K., Zimmermann J. (1998): Exact and heuristic procedures for net present value and resource levelling problems in project scheduling, Technical Report WIOR-538, University of Karlsruhe, submitted to European Journal of Operational Research.
Schwindt C. (1998): Generation of resource-constrained project scheduling problems subject to temporal constraints, Technical Report WIOR-543, University of Karlsruhe, submitted to European Journal of Operational Research.
Schwindt C., Zimmermann J. (1998): Maximizing the net present value of projects subject to temporal constraints, Technical Report WIOR-536, University of Karlsruhe.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2000 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Zimmermann, J. (2000). Project Scheduling with Discounted Cash Flows and General Temporal Constraints. In: Inderfurth, K., Schwödiauer, G., Domschke, W., Juhnke, F., Kleinschmidt, P., Wäscher, G. (eds) Operations Research Proceedings 1999. Operations Research Proceedings 1999, vol 1999. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-58300-1_65
Download citation
DOI: https://doi.org/10.1007/978-3-642-58300-1_65
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-67094-0
Online ISBN: 978-3-642-58300-1
eBook Packages: Springer Book Archive