Minimizing Earliness-Tardiness Costs of Resource-Constrained Projects

  • Conference paper
Operations Research Proceedings 1999

Part of the book series: Operations Research Proceedings 1999 ((ORP,volume 1999))

Abstract

We consider the scheduling of interdependent subprojects incurring costs for early or tardy completion w.r.t. given milestones. Each subproject consists of several activities between which minimum and maximum start-to-start time lags have to be observed. In addition, the processing of activities takes up scarce shared resources. The problem is to determine an activity schedule complying with the temporal constraints such that the resource requirements can be matched by the capacities at any point in time and the earliness-tardiness costs of the project are minimized. For solving the resource-unconstrained version of this problem, we propose a primal and a dual algorithm which are based on the iterative calculation of locally optimal descent and ascent directions, respectively. An initial (generally resource-infeasible) schedule for the problem with resource constraints is determined by applying the primal method to the resource relaxation. Within a branch-and-bound algorithm, resource conflicts are resolved by enumerating sets of precedence constraints between activities which are executed simultaneously and whose requirements exceed the capacity of at least one resource. At each enumeration node, the corresponding relaxation is solved by the dual algorithm starting with the schedule of the father node.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 99.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 132.00
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Similar content being viewed by others

References

  1. De Reyck, B., Herroelen, W. (1998): An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations. Computers and Operations Research 25, 1–17.

    Article  Google Scholar 

  2. Hiriart-Urruty, J.-B., Lemaréchal, C. (1993): Convex Analysis and Minimization Algorithms I. Springer, Berlin.

    Google Scholar 

  3. Icmeli, O., Erengüç, S.S. (1996): A branch-and-bound algorithm for the resource-constrained project scheduling problem with discounted cash flows. Management Science 42, 1395–1408.

    Article  Google Scholar 

  4. Schwindt, C., Zimmermann J. (1998): Maximizing the net present value of projects subject to temporal constraints. Report WIOR-536, Institute for Economic Sciences and Operations Research, University of Karlsruhe.

    Google Scholar 

  5. Serafini, P., Speranza, M.G. (1994a): A decomposition approach for a resource-constrained project scheduling problem. European Journal of Operational Research 75, 112–135.

    Article  Google Scholar 

  6. Serafini, P., Speranza, M.G. (1994b): A decomposition approach in a DSS for a resource-constrained project scheduling problem. European Journal of Operational Research 79, 208–219.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2000 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Schwindt, C. (2000). Minimizing Earliness-Tardiness Costs of Resource-Constrained Projects. In: Inderfurth, K., Schwödiauer, G., Domschke, W., Juhnke, F., Kleinschmidt, P., Wäscher, G. (eds) Operations Research Proceedings 1999. Operations Research Proceedings 1999, vol 1999. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-58300-1_62

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-58300-1_62

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-540-67094-0

  • Online ISBN: 978-3-642-58300-1

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics