Abstract
Determining the specific construction time forms the important content of construction in multitask flow network plan. A general calculating approach of time parameters is proposed in the process of dealing with such problems by flow network planning, and their features are collected preparedly. Main critical impact parameters are picked up, and procedure waiting float and global critical activity are defined as well. Determination approaches of activity construction time with various project duration desires are proposed when work intensity is considered, and application of flow network planning is extended. Finally, an example is given to analyze and demonstrate that the approach is available.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsReferences
Wang Z, Ding J, Liu Y et al (2012) Analysis of critical path and most critical activity in PERT networks based on Monte Carlo method. Syst Eng Electron 34(8):1646–1651 (in Chinese)
Cho JG, Yum BJ (2004) Functional estimation of activity criticality indices and sensitivity analysis of expected project completion time. J Oper Res Soc 55(8):850–859
Yang B (2002) Unifying calculating models for the network planning. Syst Eng Theor Pract 3:51–55 (in Chinese)
Li W, Meng W (2009) Engineering network planning technique. Science Press, pp 95–113(in Chinese)
Song X, He Y (2002) Comparative study between flow process plan and network plan. J Huazhong Univ Sci Tech (Urban Science Edition) 19(2):75–78(in Chinese)
Ma D, Guo X, Deng L (2012) Ammunition scheduling of carrier-based aircraft based on modified ant colony algorithm. J Syst Simul 24(6):1207–1211 (in Chinese)
Wu W, Qu J, Hu X (2010) Optimization analysis of technical preparation procedure for missile based on PERT simulation. Ordnance Ind Autom 29(8):1–3 (in Chinese)
Liu Y, Wang Z, Zhang Y (2007) Time-resources tradeoffs of PERT construction schedule under resource constraint. Adv Sci Technol Water Res 27(1):27–30 (in Chinese)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2014 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Guo, X., Li, B., Qu, X., Ma, D. (2014). An Approach for Determining Activity Implementation Time in Multitask Flow Network Plan. In: Wang, J. (eds) Proceedings of the First Symposium on Aviation Maintenance and Management-Volume II. Lecture Notes in Electrical Engineering, vol 297. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-54233-6_22
Download citation
DOI: https://doi.org/10.1007/978-3-642-54233-6_22
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-54232-9
Online ISBN: 978-3-642-54233-6
eBook Packages: EngineeringEngineering (R0)