An Approach for Determining Activity Implementation Time in Multitask Flow Network Plan

  • Conference paper
  • First Online:
  • 2290 Accesses

Part of the book series: Lecture Notes in Electrical Engineering ((LNEE,volume 297))

Abstract

Determining the specific construction time forms the important content of construction in multitask flow network plan. A general calculating approach of time parameters is proposed in the process of dealing with such problems by flow network planning, and their features are collected preparedly. Main critical impact parameters are picked up, and procedure waiting float and global critical activity are defined as well. Determination approaches of activity construction time with various project duration desires are proposed when work intensity is considered, and application of flow network planning is extended. Finally, an example is given to analyze and demonstrate that the approach is available.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD   219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

References

  1. Wang Z, Ding J, Liu Y et al (2012) Analysis of critical path and most critical activity in PERT networks based on Monte Carlo method. Syst Eng Electron 34(8):1646–1651 (in Chinese)

    Google Scholar 

  2. Cho JG, Yum BJ (2004) Functional estimation of activity criticality indices and sensitivity analysis of expected project completion time. J Oper Res Soc 55(8):850–859

    Article  MATH  Google Scholar 

  3. Yang B (2002) Unifying calculating models for the network planning. Syst Eng Theor Pract 3:51–55 (in Chinese)

    Google Scholar 

  4. Li W, Meng W (2009) Engineering network planning technique. Science Press, pp 95–113(in Chinese)

    Google Scholar 

  5. Song X, He Y (2002) Comparative study between flow process plan and network plan. J Huazhong Univ Sci Tech (Urban Science Edition) 19(2):75–78(in Chinese)

    Google Scholar 

  6. Ma D, Guo X, Deng L (2012) Ammunition scheduling of carrier-based aircraft based on modified ant colony algorithm. J Syst Simul 24(6):1207–1211 (in Chinese)

    Google Scholar 

  7. Wu W, Qu J, Hu X (2010) Optimization analysis of technical preparation procedure for missile based on PERT simulation. Ordnance Ind Autom 29(8):1–3 (in Chinese)

    Google Scholar 

  8. Liu Y, Wang Z, Zhang Y (2007) Time-resources tradeoffs of PERT construction schedule under resource constraint. Adv Sci Technol Water Res 27(1):27–30 (in Chinese)

    MathSciNet  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Xiaowei Guo .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2014 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Guo, X., Li, B., Qu, X., Ma, D. (2014). An Approach for Determining Activity Implementation Time in Multitask Flow Network Plan. In: Wang, J. (eds) Proceedings of the First Symposium on Aviation Maintenance and Management-Volume II. Lecture Notes in Electrical Engineering, vol 297. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-54233-6_22

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-54233-6_22

  • Published:

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-54232-9

  • Online ISBN: 978-3-642-54233-6

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics