Skip to main content

Requirements for Monitoring, Control and Operation

  • Chapter
  • First Online:
Monitoring, Control and Protection of Interconnected Power Systems

Part of the book series: Power Systems ((POWSYS))

  • 1823 Accesses

Abstract

The interstate integration of power grids provides multiple advantages concerning operational security as well as energy trading. Due to these facts the Central European Power System (ENTSO-E-CE, formerly UCTE) expands continually since its establishment and the ties to other interconnected systems like NORDEL grow stronger and further new ties with neighboring countries are either being constructed or planned. The recent interconnection of Turkey underlines this trend.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

eBook
USD 16.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. IPS/UPS Intergovernmental standard 1516.3-96, Electrical Equipment for A.C. Voltages from 1 to 750 kV. Requirements for Dielectric Strength of Insulation, http://www.eprussia.ru/lib/base/gost15163962003.rar (in Russian)

  2. RF Ministry of Energy, Methodical Guidelines for Power System Stability, http://energorisc.ru/content/ukaz-30062003.pdf (in Russian)

  3. RF Ministry of Energy, Guidelines of technical maintenance of Power Plants and Grids of Russian Federation, http://www.tehdoc.ru/repository/industrialsafety/1988443631.zip (in Russian)

  4. IPS/UPS Intergovernmental standard 14209-97, Loading Guide for Oil-immersed Power Transformers, http://www.ruscable.ru/doc/docgost/files/21819903408.doc (in Russian)

  5. UCTE IPS/UPS study, Synchronous Interconnection of the IPS/UPS with the UCTE: Summary of Investigations and Conclusions, Dec 2008. Available at: http://www.ucteipsups.org/

  6. WG SYSTINT (with contributions from WG SYSTMED experts), European, CIS and Mediterranean Interconnection: State of play 2004. 2nd SYSTINT Report (EURELECTRIC, Brussels, Feb 2005). Ref: 2004-030-0105

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Christian Rehtanz .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2014 Springer-Verlag Berlin Heidelberg

About this chapter

Cite this chapter

Rehtanz, C., Voropai, N., Häger, U. (2014). Requirements for Monitoring, Control and Operation . In: Häger, U., Rehtanz, C., Voropai, N. (eds) Monitoring, Control and Protection of Interconnected Power Systems. Power Systems. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-53848-3_1

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-53848-3_1

  • Published:

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-53847-6

  • Online ISBN: 978-3-642-53848-3

  • eBook Packages: EnergyEnergy (R0)

Publish with us

Policies and ethics