Abstract

In this chapter we consider the uncapacitated version of the Multilevel Lotsizing Problem (MLLP). The MLLP is the problem of determining a time-phased production schedule for a production process characterized by multilevel product structures, such that total relevant costs are minimized and demand is fulfilled without backlogging.