Abstract
We have considered the multi-mode resource-constrained project scheduling problem. The problem has been stated as a mathematical programming formulation, the versatility of which has been illustrated by examples. This should encourage the reader to try his hand on embedding other models in the formulation outlined.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsPreview
Unable to display preview. Download preview PDF.
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 1994 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
Sprecher, A. (1994). Conclusions. In: Resource-Constrained Project Scheduling. Lecture Notes in Economics and Mathematical Systems, vol 409. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-48397-4_10
Download citation
DOI: https://doi.org/10.1007/978-3-642-48397-4_10
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-57834-5
Online ISBN: 978-3-642-48397-4
eBook Packages: Springer Book Archive