The Westerschelde Tunnel Project

  • Chapter
  • First Online:
Project Management with Dynamic Scheduling
  • 5171 Accesses

Abstract

This chapter presents a real-life project example where the minimization of a bottleneck resource’s idle time is the scheduling objective. The project is an illustration of a project scheduling problem with a work continuity scheduling objective as discussed in Sect. 8.2.1. The chapter illustrates that the use of dedicated scheduling algorithms can lead to improvements in the cost outline of the schedule. Various parts of this chapter have been published in Vanhoucke (2006b, 2007).

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 149.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 199.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 199.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Amor J, Teplitz C (1998) An efficient approximation procedure for project composite learning curves. Proj Manag J 29:28–42

    Google Scholar 

  • Amor J (2002) Scheduling programs with repetitive projects using composite learning curve approximations. Proj Manage J 33:16–29

    Google Scholar 

  • Amor J, Teplitz C (1993) Improving CPM’s accuracy using learning curves. Proj Manage J 24:15–19

    Google Scholar 

  • Badiru A (1995) Incorporating learning curve effects into critical resource diagramming. Proj Manage J 2:38–45

    Google Scholar 

  • El-Rayes K, Moselhi O (1998) Resource-driven scheduling of repetitive activities. Constr Manage Econ 16:433–446

    Article  Google Scholar 

  • Kang L, Park IC, Lee BH (2001) Optimal schedule planning for multiple, repetitive construction process. J Constr Eng Manag 127:382–390

    Article  Google Scholar 

  • Moselhi O, El-Rayes K (1993) Scheduling of repetitive projects with cost optimization. J Constr Eng Manage 119:681–697

    Article  Google Scholar 

  • Shtub, A. (1991). Shtub A (1991) Scheduling of programs with repetitive projects. Proj Manage J 22:49–53

    Google Scholar 

  • Shtub A, LeBlanc L, Cai Z (1996) Scheduling programs with repetitive projects: a comparison of a simulated annealing, a genetic and a pair-wise swap algorithm. Eur J Oper Res 88:124–138

    Article  Google Scholar 

  • Vanhoucke M (2006b) Work continuity constraints in project scheduling. J Constr Eng Manag 132:14–25

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer-Verlag Berlin Heidelberg

About this chapter

Cite this chapter

Vanhoucke, M. (2013). The Westerschelde Tunnel Project. In: Project Management with Dynamic Scheduling. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-40438-2_9

Download citation

Publish with us

Policies and ethics