Skip to main content

Abstract

Enterprises often face multi-project management challenges at the same time. With the research of critical chain method for single project schedule management being ever-accelerated perfectly, it has the great practical significance application to multi-project management. This paper introduces steps of the critical chain which are used in multi-project management. Nowadays, Priority based multi-project critical chain method may lead to lower priority project’s completion time much longer than it completes independently. Considering to this, the paper puts forward the method that considerate with resource constraint and time constraint to recognize the critical chain, and demonstrates this method is feasible.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 369.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 469.00
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Cheng T, Li W, Cheng X (2007) Critical chain study and application as a new technology project management. Micro Comput Appl 5

    Google Scholar 

  • Goldratt EM (1997) Critical chain. The North River Press Publishing Corporation, Great Barrington

    Google Scholar 

  • Guo Q, Yun X (2007) Critical chain multiple project schedule management analysis. Xian Ind Univ Press 27(6):583–587

    Google Scholar 

  • Guo Q, Li H, Yun X (2008) Many critical chain projects progress optimization algorithm analyses. Ind Eng Manage 6

    Google Scholar 

  • Kendall G (2007) Research on the theory of constraints’ (TOC): the critical chain project management. Enterp Manage (5):62–67

    Google Scholar 

  • Newbold RC (1998) Project management in the fast lane: applying the theory of constraints. The St. Lucie Press, Boca Raton

    Google Scholar 

  • Tao Y (2006) Review on critical chain project management methods. Project Manage Technol 9:28–31

    Google Scholar 

  • Wei C, Liu P, Tsai Y (2002) Resource-constrained project management using enhanced theory of constraint. Int J Manage 20:561–567

    Google Scholar 

  • Xu X (2007) The critical chain project management and application. Jiangnan University

    Google Scholar 

  • Yang X, Wu H (2005) Base on critical chain method in project management. Ind Eng Manage 2:48–52

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Huan-pei Wang .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Wang, Hp., Liu, Bn., Dong, Xf. (2013). The Recognition and Optimization of the Critical Chain. In: Qi, E., Shen, J., Dou, R. (eds) The 19th International Conference on Industrial Engineering and Engineering Management. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-38427-1_41

Download citation

Publish with us

Policies and ethics