In the process of construction, project schedule delay often occurs due to various reasons. So it’s especially important for contractors to make reasonable use of claims to compensate for project loss and improve economic performance. Base on that, the paper stood in the perspective of the contractors, dividing the responsibility of the two parties in the claims caused by extension of time, further identified factors that induced extension of time and determined the key factors by SPSS. Then the paper analyzed the calculation methods of claim for extension of time and cost in terms of the key factors, finally confirmed the specific claim content and calculation for contractors once extension of time appeared.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsReferences
Chen Yongqiang, Zhang Shuibo (2008) International project claims. China Architecture and Building Press, Beijing
Chenghu (2003) Contract management and claim for construction project. Architecture and Building Press, Beijing
Gou Lina, Li Jianfeng (2011) Analysis on claim opportunity and research on claim for extension of time of contractor under FIDIC contract. Chang’an University
Huang Yao, Wu Shiming (2011a) Discussion of calculation method of time claim in international engineering project. Proj Manag Technol 9:47–50
Huang Yao, Wu Shiming (2011b) Research on the calculation of delay claims in international engineering project. Proj Manag Tech 9(6):47–50
Li Jianshe, Lv Shengpu (2005) Claim method and examples of civil engineering. China Communications Press, Beijing
Li Qiming, Zhu Shuying, Huang Wenjie (2001) Construction project contract and claims management. Science Press, Beijing
Li Zhengzui (2007) Discussion of contractors’ claims under FIDIC. Des Hydroelect Power Stn 2:99–104
Lv Shengpu, Li Jianshe, Yang Feixue (2004) Calculation methods of claim under many events disturbance. Constr Technol 12:16–18
Qiao Baihe, Shi Yongming (2006) Research on the claims management and delay claims. Chang’an University
Wang Kuan (2005) Building project risk theory and case studies. University of International Business and Economics, Beijing
Yao Xiaogang, Ling Chuanrong (2001) Complication study on compensate time limit for project under double factors affection. J Tongji Univ 3:362–365
Zhang Shuibo, He Boshen (2003) Allocation and sharing of construction risks between contract parties. J Tianjin Univ 7:257–261
Zhu Jianguo, Shen Jie (2008) Study on the principle of calculation of delay claims for project under multi-factor affection. Constr Econ 8:90–92
Zhu Jianguo, Xu Wei, Shen Jie, Cheng Hu (2012) Calculation on construction delay responsibility sharing with multi-event interference. J Southeast Univ 1:188–193
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2013 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Ao, Gj., Zhang, Xl., Zhang, Xd. (2013). Research on Contractor’s Claims Caused by Extension of Time. In: Qi, E., Shen, J., Dou, R. (eds) The 19th International Conference on Industrial Engineering and Engineering Management. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-37270-4_34
Download citation
DOI: https://doi.org/10.1007/978-3-642-37270-4_34
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-37269-8
Online ISBN: 978-3-642-37270-4
eBook Packages: Business and EconomicsBusiness and Management (R0)