Research on Contractor’s Claims Caused by Extension of Time

  • Conference paper
  • First Online:
  • 1265 Accesses

Abstract

In the process of construction, project schedule delay often occurs due to various reasons. So it’s especially important for contractors to make reasonable use of claims to compensate for project loss and improve economic performance. Base on that, the paper stood in the perspective of the contractors, dividing the responsibility of the two parties in the claims caused by extension of time, further identified factors that induced extension of time and determined the key factors by SPSS. Then the paper analyzed the calculation methods of claim for extension of time and cost in terms of the key factors, finally confirmed the specific claim content and calculation for contractors once extension of time appeared.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

References

  • Chen Yongqiang, Zhang Shuibo (2008) International project claims. China Architecture and Building Press, Beijing

    Google Scholar 

  • Chenghu (2003) Contract management and claim for construction project. Architecture and Building Press, Beijing

    Google Scholar 

  • Gou Lina, Li Jianfeng (2011) Analysis on claim opportunity and research on claim for extension of time of contractor under FIDIC contract. Chang’an University

    Google Scholar 

  • Huang Yao, Wu Shiming (2011a) Discussion of calculation method of time claim in international engineering project. Proj Manag Technol 9:47–50

    Google Scholar 

  • Huang Yao, Wu Shiming (2011b) Research on the calculation of delay claims in international engineering project. Proj Manag Tech 9(6):47–50

    Google Scholar 

  • Li Jianshe, Lv Shengpu (2005) Claim method and examples of civil engineering. China Communications Press, Beijing

    Google Scholar 

  • Li Qiming, Zhu Shuying, Huang Wenjie (2001) Construction project contract and claims management. Science Press, Beijing

    Google Scholar 

  • Li Zhengzui (2007) Discussion of contractors’ claims under FIDIC. Des Hydroelect Power Stn 2:99–104

    Google Scholar 

  • Lv Shengpu, Li Jianshe, Yang Feixue (2004) Calculation methods of claim under many events disturbance. Constr Technol 12:16–18

    Google Scholar 

  • Qiao Baihe, Shi Yongming (2006) Research on the claims management and delay claims. Chang’an University

    Google Scholar 

  • Wang Kuan (2005) Building project risk theory and case studies. University of International Business and Economics, Beijing

    Google Scholar 

  • Yao Xiaogang, Ling Chuanrong (2001) Complication study on compensate time limit for project under double factors affection. J Tongji Univ 3:362–365

    Google Scholar 

  • Zhang Shuibo, He Boshen (2003) Allocation and sharing of construction risks between contract parties. J Tianjin Univ 7:257–261

    Google Scholar 

  • Zhu Jianguo, Shen Jie (2008) Study on the principle of calculation of delay claims for project under multi-factor affection. Constr Econ 8:90–92

    Google Scholar 

  • Zhu Jianguo, Xu Wei, Shen Jie, Cheng Hu (2012) Calculation on construction delay responsibility sharing with multi-event interference. J Southeast Univ 1:188–193

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Gong-jie Ao .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Ao, Gj., Zhang, Xl., Zhang, Xd. (2013). Research on Contractor’s Claims Caused by Extension of Time. In: Qi, E., Shen, J., Dou, R. (eds) The 19th International Conference on Industrial Engineering and Engineering Management. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-37270-4_34

Download citation

Publish with us

Policies and ethics