Skip to main content
  • 2118 Accesses

Abstract

The purpose of this paper is to develop a scale and an integrated assessment method of measuring construction project manager’s performance. A performance scale of construction project manager is developed in this paper, which contains three dimensions of execution power, coordination power and competency and 24 indicators. The performance scale combines theories of manager performance, person-job matching and competency and is developed by semi-structured interviews and extraction of the key indicators from the perspective of objective, process and person capability. Moreover, 46 construction project managers are selected as the samples from Citic Heavy Industries Co., LTD and the methods of entropy, analytic hierarchy process (AHP) and fuzzy integrated judgment are integrated to evaluate the performance of construction project managers. The results of this paper provide a way to evaluate construction project manger’s performance theoretically and methodology.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Cao Q, Hoffman JJ (2010) A case study approach for developing a project performance evaluation system. Int J Proj Manage 2(18):68–74

    Google Scholar 

  • Li Shenghai (2003) Performance evaluation of the middle managers and project manager in Jiangsu SanXing Co., Ltd. Xi’an University of Technology 9 (in Chinese)

    Google Scholar 

  • Shang Mei (2004) Employment and assessment of project manager in the construction enterprise based on fuzzy comprehensive evaluation. Xi’an Univ Sci 24(1):133–135 (in Chinese)

    Google Scholar 

  • Sheu HC, Hong TL (2007) Performance evaluation model for project managers using managerial practices. Int J Proj Manage 25:543–551

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Changfa Xiang .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Cao, H., Xiang, C. (2013). An Empirical Study on Performance Evaluation of Construction Project Manager. In: Xu, B. (eds) 2012 International Conference on Information Technology and Management Science(ICITMS 2012) Proceedings. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-34910-2_42

Download citation

Publish with us

Policies and ethics