Abstract
The financing way of projects in BT mode provides a feasible way for solving the contradiction problem of the municipal infrastructure construction funds. As the key risk factor of influencing BT project investment control, engineering variations controlling rights becomes the focus point between two parties of BT project. The paper explains the definition and category also demonstrates processing program of engineering variations, and further analyzes the reasons of variations, then takes Shenzhen metro line 5 as an example, which provides the theoretical basis and empirical analysis for engineering variations management in domestic urban rail transit project under BT mode.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Fang jun (2004) Construction project engineering variations management and control. Constr Econ (10):54–57
Gao hua (2009) Research on the investment and construction contract of BT mode in China. Tianjin University, Tianjin
Lin Jianyi (2007) Management of project changes in construction engineering. Beijing Jiaotong University, Beijing
Lin maode (2009) Shenzhen subway BT model innovation of application. Urban Rapid Rail Transit (6):56–59
Liu qingming (2009) Brief talk on change management of construction project. Shanxi Archit (13):188
Liu wen, Zhu yihai (2012) Engineering design and variations in Shenzhen metro line 5 BT project. Railw Eng (1):73–76
Tong lin (2007) Study on BT model of public infrastructure projects. Tong-Ji University, Shanghai
Wang hao (2005) The application of infrastructure projects in BT mode. Macroeconomics (10):49–53
Wang xianjin (2005) Questions discussion on BT model of municipal infrastructure projects. J Chongqing Traffic Inst (4):24–27
ZhangLi (2006) Research on investment control in BT project. Southeast University, Nanjing
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2013 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Lu, Xc., Yin, Yl. (2013). Research on Engineering Variations Management of Urban Rail Transit Project in BT Mode – A Case of Shenzhen Metro Line 5. In: Dou, R. (eds) Proceedings of 2012 3rd International Asia Conference on Industrial Engineering and Management Innovation (IEMI2012). Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-33012-4_29
Download citation
DOI: https://doi.org/10.1007/978-3-642-33012-4_29
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-33011-7
Online ISBN: 978-3-642-33012-4
eBook Packages: Business and EconomicsBusiness and Management (R0)