Skip to main content

Research on Engineering Variations Management of Urban Rail Transit Project in BT Mode – A Case of Shenzhen Metro Line 5

  • Conference paper
  • First Online:
  • 2643 Accesses

Abstract

The financing way of projects in BT mode provides a feasible way for solving the contradiction problem of the municipal infrastructure construction funds. As the key risk factor of influencing BT project investment control, engineering variations controlling rights becomes the focus point between two parties of BT project. The paper explains the definition and category also demonstrates processing program of engineering variations, and further analyzes the reasons of variations, then takes Shenzhen metro line 5 as an example, which provides the theoretical basis and empirical analysis for engineering variations management in domestic urban rail transit project under BT mode.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

References

  • Fang jun (2004) Construction project engineering variations management and control. Constr Econ (10):54–57

    Google Scholar 

  • Gao hua (2009) Research on the investment and construction contract of BT mode in China. Tianjin University, Tianjin

    Google Scholar 

  • Lin Jianyi (2007) Management of project changes in construction engineering. Beijing Jiaotong University, Beijing

    Google Scholar 

  • Lin maode (2009) Shenzhen subway BT model innovation of application. Urban Rapid Rail Transit (6):56–59

    Google Scholar 

  • Liu qingming (2009) Brief talk on change management of construction project. Shanxi Archit (13):188

    Google Scholar 

  • Liu wen, Zhu yihai (2012) Engineering design and variations in Shenzhen metro line 5 BT project. Railw Eng (1):73–76

    Google Scholar 

  • Tong lin (2007) Study on BT model of public infrastructure projects. Tong-Ji University, Shanghai

    Google Scholar 

  • Wang hao (2005) The application of infrastructure projects in BT mode. Macroeconomics (10):49–53

    Google Scholar 

  • Wang xianjin (2005) Questions discussion on BT model of municipal infrastructure projects. J Chongqing Traffic Inst (4):24–27

    Google Scholar 

  • ZhangLi (2006) Research on investment control in BT project. Southeast University, Nanjing

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Xiao-chun Lu .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Lu, Xc., Yin, Yl. (2013). Research on Engineering Variations Management of Urban Rail Transit Project in BT Mode – A Case of Shenzhen Metro Line 5. In: Dou, R. (eds) Proceedings of 2012 3rd International Asia Conference on Industrial Engineering and Management Innovation (IEMI2012). Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-33012-4_29

Download citation

Publish with us

Policies and ethics