Abstract
A very limited research of fixing uncertainties in environmental issues (EI) actually encountered biggest problems for company, especially in late delivery (LD) of project completion for construction industry (CI). Uncertainty could be happens causes by many factors which known or unknown, statically to totally ignorance. Many factors of uncertainties have been modelled in previous research by ignored factors in EI. However, in the real cases all the factors must be manage even it is in-deterministic. Therefore, the modelling of uncertainty factors in EI for CI is very important to be studied, and it will be considered to be used as guidance for decision makers while they are facing with the problems that related to uncertainties. The uncertainty of EI can split into 2 categories; acts of God and acts of humans.. Preliminary result of conceptual model for uncertainty factors in EI is presented according to previous case study.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Wazed, M.A., Ahmed, S., Yusoff, N.: Uncertainty Factors in Real Manufacturing Environment. Australian Journal of Basic and Applied Sciences 3(2), 342–351 (2009)
Walker, W.E., Harremoes, P., Van Der Sluijs, J.P., Van Asselt, M.B.A., Janssen, P., Krayer, M.P.: Defining Uncertainty: A Conceptual Basis for Uncertainty Management in Model-Based Decision Support. Integrated Assessment 4(1), 5–7 (2003)
Refsgaard, J.C.: CRES Annual Meeting reportof Geological Survey of Denmark and Greenland Ministry of Climate and Energy. Svendborg (November 17-18, 2010)
Polat, G., Ballard, G.: Waste in Turkish Construction: Need for Lean Construction Techniques (2004) White paper via, www.iglc2004.dk/_root/media/13080_067-polat-ballard-final.pdf
Prasanta, K.D.: Decision Support System for Risk Management: A Case Study. Management Decision 39(8), 634–649 (2001)
Koh, S.C.L., Saad, S.M.: Development of a Business Model for Diagnosing Uncertainty in ERP Environments. International Journal of Production Research 40 (2002)
Koh, S.C.L., Gunasekaran, A.: A Knowledge Management Approach for Managing Uncertainty in Manufacturing. Industrial Management and Data Systems 106, 439 (2006)
Shahin, A., Abourizk, S., Mohamed, Y., Fernando, S.: A Simulation-Based Framework for Quantifying The Cold Regions Weather Impacts on Construction Schedules. In: Proceedings of the 2007 Winter Simulation Conference, pp. 1798–1804 (2007)
Refsgaard, J.C., Jeroen, P., Anker, L.H., Peter, A.V.: Uncertainty in the Environmental Modelling Process - A Framework and Guidance. Environmental Modelling & Software 22, 1543–1556 (2007)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2012 ICST Institute for Computer Science, Social Informatics and Telecommunications Engineering
About this paper
Cite this paper
Baharum, Z., HaszlinnaMustaffa, N., Ngadiman, M.S., Yacob, A. (2012). Modelling Uncertainty Factors in Environmental Issues on Late Delivery for Construction Industry: A Propose. In: Das, V.V., Ariwa, E., Rahayu, S.B. (eds) Signal Processing and Information Technology. SPIT 2011. Lecture Notes of the Institute for Computer Sciences, Social Informatics and Telecommunications Engineering, vol 62. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-32573-1_29
Download citation
DOI: https://doi.org/10.1007/978-3-642-32573-1_29
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-32572-4
Online ISBN: 978-3-642-32573-1
eBook Packages: Computer ScienceComputer Science (R0)