Skip to main content

Research on the Risk of Large Scale Gymnasiums BOT Financing and Risk Management

  • Conference paper
Information and Business Intelligence (IBI 2011)

Part of the book series: Communications in Computer and Information Science ((CCIS,volume 268))

Included in the following conference series:

  • 1433 Accesses

Abstract

With the growing demand of Large Scale Gymnasiums and the tight budget on the government, BOT is one of the best alternatives to solve this problem. However, in order to create a successful BOT project, it is necessary to avoid controllable capital structure risk, completion risk and revenue risk, etc. First, the concept of BOT risk and risk management is introduced. The paper aims to study the BOT model in the investment and financing system of the large scale gymnasiums in china and understand the present situation of BOT financing by analyzing the significance and features of risks. The specific categories of risks are classified into uncontrollable and controllable risks theoretically. Some strategies are proposed to deal with different categories of risks.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Hwang, Y.L.: Project and policy analysis of build-operate-transfer infrastructure development, Ph.D. Dissertation, Department of Civil Engineering, University of California at Berkeley (1995)

    Google Scholar 

  2. Walker, C., Smith, A.J.: Privatized Infrastructure: The Build Operate Transfer. Thomas Telford Publications (1996)

    Google Scholar 

  3. Walker, C., Smith, A.J. (eds.): Privatized infrastructure: the BOT approach. Thomas Telford, London (1995)

    Google Scholar 

  4. Lam, P.T.I.: A sectoral review of risks associated with major infrastructure projects. International Journal of Project Management, 77–87 (1999)

    Google Scholar 

  5. David, A.K.: Risk modeling in energy contracts between host utilities and BOT plant investors. IEEE Transactions on Energy Conversion, 359–366 (l996)

    Google Scholar 

  6. Bell, D.E.: Risk, return, and utility. Management Science, 23–30 (1995)

    Google Scholar 

  7. Feng, C.M., Kang, C.C.: Risk identication and measurement of BOT projects. Journal of the Eastern Asia Society for Transportation Studies, 331–350 (1999)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2012 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Hongchang, L., Hongyu, L. (2012). Research on the Risk of Large Scale Gymnasiums BOT Financing and Risk Management. In: Qu, X., Yang, Y. (eds) Information and Business Intelligence. IBI 2011. Communications in Computer and Information Science, vol 268. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-29087-9_30

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-29087-9_30

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-29086-2

  • Online ISBN: 978-3-642-29087-9

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics