Abstract
The current means of obtaining domain-imposed requirements through users or domain experts are often suboptimal especially for the relatively new area of interest. This paper suggests the use of basic research findings as the more objective source and proposes an approach that translates research findings into a UML model based on which the domain-imposed requirements can be extracted. By using business project management as the domain of interest, it outlines the steps in the said approach and describes the use of the resulting domain model during the requirement specification for a Project Management Information System that caters specially to the needs of business projects. Theoretically, the same method can be applied to the other areas of management and an enterprise domain model could be developed in a similar way. Given equity access to all software developers, it is envisaged that meeting standard domain-imposed requirements would become a pre-requisite for competing enterprise systems in the future.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Abels, S., Ahlemann, F., Hahn, A., Hausmann, K., Strickmann, J.: PROMONT – A Project Management Ontology as a Reference for Virtual Project Organizations. In: Meersman, R., Tari, Z., Herrero, P. (eds.) OTM 2006 Workshops. LNCS, vol. 4277, pp. 813–823. Springer, Heidelberg (2006)
Berztiss, A.T.: Domain analysis for business software systems. Information Systems 24(7), 555–568 (1990)
OMG, Business Motivation Model (BMM) Version 1.0. OMG Document Number: formal/2008-08-02 (2008), http://www.omg.org/spec/BMM/1.0/ (retrieved on May 10, 2009)
OMG, Business Process Definition MetaModel II (BPDM): Process Definitions Version 1.0. OMG Document Number: formal/2008-11-04 (2008), http://www.omg.org/spec/BPDM/1.0 (retrieved on May 10, 2009)
Brown, A.W., et al.: Introduction: Model, Modelling and Model Driven architecture (MDA). In: Model-Driven Software Development, pp. 1–16. Springer, Heidelberg (2005)
Bryde, D.J.: Modelling project management performance. International of Quality & Reliability Management 20(2), 229–254 (2003)
Bryde, D.J.: Project management concepts, methods and application. International Journal of Operations & Production Management 23(7), 775–793 (2003)
Christenson, D., Walker, D.H.T.: Using vision as a critical success element in project management. International Journal of Managing Projects in Business 1(4), 611–622 (2008)
Cicmil, S.J.K.: Critical factors of effective project management. The TQM Magazine 9, 390–396 (1997)
CPPM, A Guide to the Project & Program Management Standard Certified Project Manager (CPM) and (CPP) (2007), http://www.iappm.org (retrieved on August 28, 2008)
Cranefield, S.: Networked Knowledge Representation and Exchange using UML and RDF. Journal of Digital information 1(8) (2001)
Dinsmore, P.: Why should project management matters to CEO (2006), http://www.chiefprojectofficer.com/column/175 (retrieved on April 12, 2007)
Faisal, A.: Trapped in between: Realities of the project world. Trafford Publishing (2006)
GAPPS, Global Alliance for Project Performance Standards - A framework for performance based competency standards for global level 1 and 2 project managers (2007), http://www.globalpmsstandards.org (retrieved on January 15, 2009)
Geoghegan, L., Dulewicz, V.: “Do project managers’ leadership competencies contribute to project success?”. Project Management Journal 39(4), 58–67 (2008)
Gómez-Pérez, A., et al.: Methodologies and methods for building ontologies. In: Ontology Engineering, pp. 107–197. Springer, Heidelberg (2006)
Grangel, R., et al.: UML for enterprise modelling: basis for a Model-Driven Approach. In: Enterprise Interoperability - New Challenges and Approaches, pp. 91–101. Springer, London (2007)
Gruber, T.: What is an ontology (2005), http://wwwksl.stanford.edu/kst/what-is-an-ontology.html (retrieved on April 12, 2008)
Hull, E., et al.: Requirements engineering in the solution domain. In: Requirements Engineering, 2nd edn., Springer, Heidelberg (2005)
ICB, IPMA Competency Baseline V3.0 (2006), http://www.ipma.ch (retrieved on August 28, 2008)
OGC, Introduction to PRINCE2 (2008), http://www.ogc.gov.uk/prince/about_p2/about_intro.html (retrieved on May 2, 2008)
Kotnour, T.: Organization learning practices in the project management environment. International Journal of Quality & Reliability Management 17, 393–406 (2000)
March, S.T., Allen, G.N.: Challenges in Requirements Engineering: A Research Agenda for Conceptual Modeling. In: Lyytinen, K., Loucopoulos, P., Mylopoulos, J., Robinson, B. (eds.) Design Requirements Engineering. LNBIP, vol. 14, pp. 157–165. Springer, Heidelberg (2009)
Maylor, H., et al.: From projectification to programmification. International Journal of Project Management 24, 663–674 (2006)
Milosevic, D.Z., Srivannaboon, S.: A theoretical framework for aligning project management with business strategy. Project Management Journal 37(3), 98–100 (2006)
Morris, P.W.G.: Research trends in the 1990s – the need now to focus on the business benefits of project management. In: The Frontiers of Project Management Research, Project Management Institute, ch. 2 (2003)
Morris, P.W.G., Jamieson, A.: Moving from corporate strategy to project strategy. Project Management Journal 36(4), 5–18 (2005)
Nagypal, G.: Ontology Development - Methodologies for ontology engineering. In: Semantic Web Services, pp. 107–134. Springer, Heidelberg (2007)
OMG, Introduction to OMG’s Unified Modelling Language (UML®) (2004), http://www.omg.org/gettingstarted/what_is_uml.html (retrieved on July 17, 2010)
Omoronyia, I., Sindre, G., Stålhane, T., Biffl, S., Moser, T., Sunindyo, W.: A Domain Ontology Building Process for Guiding Requirements Elicitation. In: Wieringa, R., Persson, A. (eds.) REFSQ 2010. LNCS, vol. 6182, pp. 188–202. Springer, Heidelberg (2010)
OSM, Organization Structure MetaModel 2nd Initial Submission Version 0.5. Submitted by 88Solutions, Adaptive, Borland Software, Data Access Technologies, EDS, Lombardi, Software., in response to: Organization Structure Metamodel RFP (OMG Document bei/2004-06-05) (2006)
Pan, Y., Xie, G.T., Ma, L., Yang, Y., Qiu, Z., Lee, J.: Model-Driven Ontology Engineering. In: Spaccapietra, S. (ed.) Journal on Data Semantics VII. LNCS, vol. 4244, pp. 57–78. Springer, Heidelberg (2006)
PIPC, PIPC Global Project Management Survey News Releases, London (December 2004)
PMI, PMBOK® Guide : A Guide to the Project Management Body of Knowledge, 4th edn., Project Management Institute (2008)
Reinhartz-Berger, I.: Towards automation Of domain modelling. Data & Knowledge Engineering 69, 491–515 (2010)
Rolland, C.: From Conceptual Modeling to Requirements Engineering. In: Embley, D.W., Olivé, A., Ram, S. (eds.) ER 2006. LNCS, vol. 4215, pp. 5–11. Springer, Heidelberg (2006)
Siau, K., Lee, L.: Are use case and class diagrams complementary in requirements analysis? An experimental study on use case and class diagrams in UML. Requirements Engineering 9, 229–237 (2004)
SBVR, Business Vocabulary and Business Rules version 1.0. OMG Document Number: formal/2008-01-02 (2008), http://www.omg.org/spec/SBVR/1.0 (retrieved on May 11, 2009)
Srivannaboon, S.: Linking project management with business strategy. Project Management Journal 37(5), 88–96 (2006)
PMI, The Standard for Program Management. 2nd edn., Project Management Institute (2008)
Vauquier, D.: Semantic Modelling Version 1.3. Praxeme Institute (2008)
Winter, M., et al.: Focusing on business projects as an area for future research: an explanatory discussion of four perspectives. International Journal of Project Management 24, 699–709 (2006)
Wong, S.M., et al.: Developing P.M.I.S for business projects based on social science research findings & ontology modelling. In: Proceedings of IADIS International Conference - Information Systems, Porto, Portugal (2010)
Zwikael, O.: Top management involvement in project management: Exclusive support practices for different project scenarios. International Journal of Managing Projects in Business 1(3), 387–403 (2008)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2013 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
Wong, S.M., Lafaye, JY., Boursier, P. (2013). Capturing Domain-Imposed Requirements Based on Basic Research Findings. In: Glykas, M. (eds) Business Process Management. Studies in Computational Intelligence, vol 444. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-28409-0_14
Download citation
DOI: https://doi.org/10.1007/978-3-642-28409-0_14
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-28408-3
Online ISBN: 978-3-642-28409-0
eBook Packages: EngineeringEngineering (R0)