Skip to main content

The Problem and Strategy on Subsidence Assessment of Construction Projects under Ballastless Track in Chinese High-Speed Railway

  • Conference paper
Proceedings of the 1st International Workshop on High-Speed and Intercity Railways

Part of the book series: Lecture Notes in Electrical Engineering ((LNEE,volume 147))

  • 2460 Accesses

Abstract

The subsidence assessment of construction projects under track is very important for laying ballastless track for high-speed railway. The method how to obtain the measurement of the subsidence is introduced in details. And then, the discussion on the usability and scientificity of the relevant subsidence assessment method is carried on. The problem and weakness about the assessment is analyzed and demonstrated. According to the analysis and demonstration, the improved assessment is put forward here. Also, the effective and simple method to obtain the subsidence measurement is suggested. The reliability and accuracy of the measurement and the assessment is emphasised. At last, the assessment results are demonstrated in order to explain the improvement, basing on the examples of subsidence assessment about Chinese high-speed railway in ballastless track.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  • Chen, J., et al.: Technical manual of assessment for laying condition about ballastless track of high speed railway (TJS2006-158), the Ministry of Railways of the P. R. China (2006) ISBN: 15113.2348

    Google Scholar 

  • Xiao, X., et al.: Specifications for the first and second order levelling (GB/T 12897-2006), Standardization Administration of the P. R. China & General Administration of Quality Supervision, Inspection and Quarantine of the P. R. China (2006) ISBN: 155066.1-8616

    Google Scholar 

  • Zhu, Y., et al.: Specifications for survey engineering of high speed railway (TB10601-2009), the Ministry of Railways of the P. R. China (2009) ISBN: 15113.3088

    Google Scholar 

  • SWJTU Railway Development Company Limited. Technical manual of assessment for laying condition about JING-HU high speed railway, Technical Manual (2007)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Shan Gao .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2012 Springer-Verlag GmbH Berlin Heidelberg

About this paper

Cite this paper

Gao, S., Gong, Z. (2012). The Problem and Strategy on Subsidence Assessment of Construction Projects under Ballastless Track in Chinese High-Speed Railway. In: Ni, YQ., Ye, XW. (eds) Proceedings of the 1st International Workshop on High-Speed and Intercity Railways. Lecture Notes in Electrical Engineering, vol 147. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-27960-7_43

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-27960-7_43

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-27959-1

  • Online ISBN: 978-3-642-27960-7

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics