Skip to main content

Part of the book series: Advances in Intelligent and Soft Computing ((AINSC,volume 111))

  • 1693 Accesses

Abstract

Most of the traditional human resource evaluations are applied to individual employees. The study object in this paper is the general state of human resources of power generation enterprise. According to the feature and actual situation of the study object, this paper established the evaluation indicator system of power generation enterprise human resource by using Delphi method. Based on the theory of fuzzy mathematics, combined with AHP and Delphi method, the multi-level fuzzy comprehensive evaluation model was established. Through the empirical study on a 330MW power plant, it indicated that using this research method can acquaint the status of human resources accurately and efficiently.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 259.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 329.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Yu, L., Han, B.: Synthesizing evaluation of technology human resource in high-tech business enterprise. Journal of China Agricultural University (6), 72–76 (2003)

    Google Scholar 

  2. Liu, H.: HRM optimizing and system innovation of the generate electricity enterprise behind the system reform of electric power. North China Electric Power University (2003)

    Google Scholar 

  3. Saaty, T.L.: Decision making in economics, political,social and technological environments with analytic hierarchy process. RWS, New York (1994)

    Google Scholar 

  4. Guan, B., Hu, J.: Application of AHP Based Fuzzy Comprehensive Evaluation in Scheme Selection of Traffic Guarantee. Journal of Henan University (Natural Science) (12), 91–94 (2005)

    Google Scholar 

  5. Liu, Y.: AHP Based Fuzzy Comprehensive Evaluation for Townifying Level. Journal of Shenyang Jianzhu University (Natural Science) (1), 132–137 (2008)

    Google Scholar 

  6. Lin, S.: Environment Impact Assessment of Desert Railway Based on Fuzzy Comprehensive Evaluation. Journal of The China Railway Society (10), 84–90 (2009)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2011 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Xin, L., Dong-xiao, N., Ping, Z., Jin-peng, L. (2011). Research on Comprehensive Evaluation of Power Generation Enterprise Human Resource. In: Jiang, L. (eds) Proceedings of the 2011, International Conference on Informatics, Cybernetics, and Computer Engineering (ICCE2011) November 19–20, 2011, Melbourne, Australia. Advances in Intelligent and Soft Computing, vol 111. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-25188-7_13

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-25188-7_13

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-25187-0

  • Online ISBN: 978-3-642-25188-7

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics