Schedule Risk Analysis

  • Chapter
  • First Online:
Project Management with Dynamic Scheduling

Abstract

The interest in activity sensitivity from both the academics and the practitioners lies in the need to focus a project manager’s attention on those activities that influence the performance of the project. When management has a certain feeling of the relative sensitivity of the various activities on the project objective, a better management focus and a more accurate response during project tracking or control should positively contribute to the overall performance of the project. The technique known as Schedule Risk Analysis (SRA) connects the risk information of project activities to the baseline schedule and provides sensitivity information of individual project activities as a way to assess the potential impact of uncertainty on the final project duration and cost.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 109.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Notes

  1. 1.

    Alternatively, the sample standard deviations can be used, given by \({s}_{{d}_{i}} = \sqrt{\frac{\sum\limits_{k=1}^{\mathrm{nrs}}{({d}_{i}^{k}-\bar{{d}_{i}})}^{2}} {\mathrm{nrs}-1}} \ \mathrm{and}\ {s}_{\mathrm{RD}} = \sqrt{\frac{\sum\limits_{k=1}^{\mathrm{nrs}}{(\mathrm{{RD}}^{k}-\overline{\mathrm{RD}})}^{2}} {\mathrm{nrs}-1}}\).

  2. 2.

    Let (x i , y i ) and (x j , y j ) be a pair of (bivariate) observations. If x j  − x i and y j  − y i have the same sign, the pair is concordant, if they have opposite signs, the pair is discordant.

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2012 Springer-Verlag Berlin Heidelberg

About this chapter

Cite this chapter

Vanhoucke, M. (2012). Schedule Risk Analysis. In: Project Management with Dynamic Scheduling. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-25175-7_5

Download citation

Publish with us

Policies and ethics