Abstract
Passing the investigation to the construction, the paper elaborate five kinds of reason of limiting the development of equipment leasing, such as the hasty time, the high peak of construction, the construction in other regional, equipments sudden breakdown and so on, propose the lease mode of the engineering equipment according to government biding, elaborates the reference to flow process frame chart of the mode in detail, as well as the questions concerning contract text, revenue, and acceptance of the bid condition etc. to be solved.
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsPreview
Unable to display preview. Download preview PDF.
References
Tan, L.Y.: Shallow the Present Condition and Foreground of the Craft for Talking the Our Country Engineering Machinery Rental. Construction Machinery Technique and Supervision (May 2005) ( in China)
Qi, M.X., Long, Z.F.: The Engineering Construction Machinery Leases the Study of Way. The Construction Machinery (January 2005) (in China)
Qing, W.Y.: Engineering by Contract and Tender Quote. University Book Concern in Chongqing (December 2001) (in China)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2012 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Yan, Z. (2012). The Lease Mode of the Engineering Equipments According to Government Bidding. In: Zhang, L., Zhang, C. (eds) Engineering Education and Management. Lecture Notes in Electrical Engineering, vol 112. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-24820-7_33
Download citation
DOI: https://doi.org/10.1007/978-3-642-24820-7_33
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-24819-1
Online ISBN: 978-3-642-24820-7
eBook Packages: EngineeringEngineering (R0)