Skip to main content

Master Planning - Supply Network Planning

  • Chapter
  • First Online:
Advanced Planning in Supply Chains

Part of the book series: Management for Professionals ((MANAGPROF))

  • 5033 Accesses

Abstract

There are a number of decisions which have to be made in the medium-term because these have to be prepared some weeks in advance (like an additional shift on Saturdays which has to be agreed to by worker’s representatives) or take some time to become e ective (like building up seasonal stocks). Another reason for placing decisions at the medium-term planning level (instead of short-term) is the scope of consequences. As an example consider a manufacturer with several production sites with similar capabilities. Decisions regarding the allocation of production quantities to sites and directives which site will serve which market will have consequences on the profitability of each site and should be made centrally. Note that short-term production planning and scheduling is often done decentrally.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 54.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 64.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 69.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Bibliography

  • Billington, P. J.; McClain, J. O.; Thomas, L. J. (1983) Mathematical programming approaches to capacity-constrained MRP systems: Review, Formulation and Problem Reduction, Management Science, vol. 29, no. 10, 1126 1141

    Article  Google Scholar 

  • Gunnarsson, H.; Rönnqvist, M. (2008) Solving a multi-period supply chain problem for a pulp company using heuristics–An application to Södra Cell AB, International Journal of Production Economics, vol. 116, 75 94

    Article  Google Scholar 

  • Hanssmann, F.; Hess, S. W. (1960) A linear programming approach to production and employment scheduling, Management Technology, vol. MT-1, no. 1, 46 51

    Google Scholar 

  • Hillier, F. S.; Liebermann, G. J. (2005) Introduction to Operations Research, McGraw-Hill, Boston, 8th ed.

    Google Scholar 

  • Kanyalkar, A. P.; Adil, G. K. (2005) An integrated aggregate and detailed planning in a multi-site production environment using linear programming, International Journal of Production Research, vol. 43, 4431 4454

    Article  Google Scholar 

  • Mula, J.; Peidro, D.; Diaz-Madronero, M.; Vicens, E. (2010) Mathematical programming models for supply chain production and transport planning, European Journal of Operational Research, vol. 204, 377 390

    Article  Google Scholar 

  • Shirodkar, S.; Kempf, K. (2006) Supply chain collaboration through shared capacity models, Interfaces, vol. 36, no. 5, 420 432

    Article  Google Scholar 

  • Sodhi, M. S.; Tang, C. S. (2009) Modeling supply-chain planning under demand uncertainty using stochastic programming: A survey motivated by asset-liability management, International Journal of Production Economics, vol. 121, 728 738

    Article  Google Scholar 

  • Stadtler, H. (2008) Linear and mixed integer programming, in: H. Stadtler; C. Kilger (Eds.) Supply Chain Management and Advanced Planning, Springer, Berlin et al., 4th ed., 517 527

    Chapter  Google Scholar 

  • Tempelmeier, H. (2005) Bestandsmanagement in Supply Chains, Books on Demand, Norderstedt, 1st ed.

    Google Scholar 

  • Vollman, T. E.; Berry, W. L.; Whybark, D. C. (1997) Manufacturing planning and control systems, Irwin/McGraw-Hill, New York, 4th ed.

    Google Scholar 

  • von Lanzenauer, C. H. (1970) Production and employment scheduling in multistage production systems, Naval Research Logistics Quarterly, vol. 17, no. 2, 193 198

    Article  Google Scholar 

  • Walther, G.; Spengler, T. (2005) Impact of WEEE-directive on reverse logistics in Germany, International Journal of Physical Distribution and Logistics Management, vol. 35, 337 361

    Article  Google Scholar 

  • Wassermann, R.; Lautenschläger, M.; Reuter, B.; Steiner, C. (2006) Automotive Case Study, Real Optimization with SAP APO, Heidelberg, Berlin

    Google Scholar 

  • Waters, D. (2003) Inventory Control and Management, John Wiley, 2nd ed.

    Google Scholar 

  • Winston, W. L. (2004) Operations Research: Applications and algorithms, Thomson/Brook/Cole, Belmont, California, 4th ed.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

Copyright information

© 2012 Springer-Verlag Berlin Heidelberg

About this chapter

Cite this chapter

Stadtler, H. (2012). Master Planning - Supply Network Planning. In: Advanced Planning in Supply Chains. Management for Professionals. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-24215-1_6

Download citation

Publish with us

Policies and ethics