MCDM Applications on Effective Project Management for New Wafer Fab Construction

  • Mei-Chen Lo
  • Gwo-Hshiung Tzeng
Part of the Smart Innovation, Systems and Technologies book series (SIST, volume 10)

Abstract

This paper presents a multicriteria analysis approach for finding a route of evaluation on construction project in semiconductor manufacturing fabrication (fab). The Analytic Hierarchy Process (AHP) method is used to determine the weights for evaluation criteria among decision makers, including fab construction team, users and top management. The subjectivity and vagueness in the categorization process is dealt with by using fuzzy numbers for linguistic terms. This empirical study orients a project management on design change requirement (DCR) during construction a new wafer fab in Taiwan, and illustrates the effectiveness of the proposed approach. This study provides empirical evidence on project management effectiveness with the intent of contributing to a better understanding and improvement of project management practices. It looks into the causes of DCR and then provides possible solutions to minimize the occurrence of the DCR in the future fab construction project.

Keywords

Performance Evaluation Analytic Hierarchy Process (AHP) Multiple Criteria Decision Making (MCDM) Design Change Requirement (DCR) Wafer fab Semiconductor 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. 1.
    Crawford, L.: Senior management perceptions of project management competence. International Journal of Project Management 23, 7–16 (2005)CrossRefGoogle Scholar
  2. 2.
    Fulmer, W.E.: Shaping the Adaptive Organization: Landscapes, Learning, and Leadership in Volatile Times. AMACOM, New York (2000)Google Scholar
  3. 3.
    Hwang, C.L., Yoon, K.: Multiple Attribute Decision Making: Methods and Applications. Springer, New York (1981)zbMATHGoogle Scholar
  4. 4.
    Kawakita, J.: The KJ method – a scientific approach to problem solving, Technical report, Kawakita Research Institute, Tokyo (1975)Google Scholar
  5. 5.
    Keeney, R.L., Raiffa, H.: Decisions with Multiple Objective: Preference and Value Tradeoffs. Wiley, New York (1976)Google Scholar
  6. 6.
    Lo, M.C., Chang, C.Y., Tzeng, G.H.: Semiconductor Project Management of Design Change Requirement for New Wafer Fab Construction. In: Proceedings of the International Conference of Asia Pacific Industrial Engineering & Management (APIEMS 2002), Taipei, Taiwan (2002a)Google Scholar
  7. 7.
    Lo, M.C., Wu, H.C., Lai, C.M., Chiang, S.H.: A Study on Resource Management of Design Change Requirement for New Wafer Fab Construction. In: Semiconductor Manufacturing Technology Workshop (SMTW 2002), Hsin-Chu, Taiwan (2002b)Google Scholar
  8. 8.
    Saaty, T.L.: A Scaling Method for Priorities in Hierarchical Structures. Journal of Mathematical Psychology 15(2), 234–281 (1977)MathSciNetzbMATHCrossRefGoogle Scholar
  9. 9.
    Saaty, T.L.: The Analytic Hierarchy Process: Planning, Priority Setting. McGraw-Hill, New York (1980)zbMATHGoogle Scholar
  10. 10.
    Tang, M.T., Tzeng, G.H., Wang, S.W.: A Hierarchy Fuzzy MCDM Method for Studying Electronic Marketing Strategies in the Information Service Industry. Journal of International Information Management 8(1), 1–22 (1999)Google Scholar
  11. 11.
    Teng, J.Y., Tzeng, G.H.: Fuzzy Multicriteria Ranking of Urban Transportation Investment Alternatives. Transportation Planning and Technology 20(1), 15–31 (1996)CrossRefGoogle Scholar
  12. 12.
    Tsaur, S.H., Tzeng, G.H., Wang, G.C.: The Application of AHP and Fuzzy MCDM on the Evaluation Study of Tourist Risk. Annals of Tourism Research 24(4), 796–812 (1997)CrossRefGoogle Scholar
  13. 13.
    Tzeng, G.H.: A study on the PATTERN Method for the Decision Process in the Public System. Japan Journal of Behaviormetrics 4(2), 29–44 (1977)Google Scholar
  14. 14.
    Tzeng, G.H., Shiah, T.A., Teng, J.Y.: A Multiobjective Decision Making Approach to Energy Supply Mix Decisions in Taiwan. Energy Sources 16(3), 301–316 (1994)CrossRefGoogle Scholar

Copyright information

© Springer-Verlag Berlin Heidelberg 2011

Authors and Affiliations

  • Mei-Chen Lo
    • 1
    • 2
  • Gwo-Hshiung Tzeng
    • 2
  1. 1.Department of Business ManagementNational United UniversityMiaoliTaiwan
  2. 2.Institute of Project ManagementKainan UniversityLuchuTaiwan

Personalised recommendations