Skip to main content

Application of Integrated Decision Support Model in Tendering

  • Conference paper
Recent Trends in Wireless and Mobile Networks (CoNeCo 2011, WiMo 2011)

Abstract

Tendering is an important issue that requires Decision Support System (DSS) attention as a decision to award tenders to certain competing applications could influence successful completion of a project. This paper presents a framework of DSS for a tendering process based on a combination of single criteria statistical model, weighted model and an extended AHP model known as Guided AHP (GAHP). This hybrid model allows single criteria tender prices which are considered abnormal to be excluded from further detail multicriteria GAHP evaluation. GAHP is proposed to minimize the possibility of inconsistent data entry and to improve evaluation accuracy and flexibility. The use of model integration takes the advantage of their strengths and complements each other’s weaknesses. Finally, a real organizational government tendering application is applied to demonstrate the potential of the proposed framework.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Grilo, R.J.-G.: Challenging electronic procurement in the AEC sector: A BIM-based integrated perspective. Automation in Construction (2010)

    Google Scholar 

  2. Estache, A., Limi, A.: (Un)bundling infrastructure procurement: Evidence from water supply and sewage projects, Utilities Policy (2011)

    Google Scholar 

  3. Jaskowski, P., Slawomir, B., Robert, B.: Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment. Automation in Construction (2010)

    Google Scholar 

  4. Kapliński, O., Janusz, L.: Three phases of multifactor modelling of construction processes. Journal of Civil Engineering and Management 12(2), 127–134 (2006)

    Google Scholar 

  5. Fong, P.S.W., Choi, S.K.Y.: Final contractor selection using the analytical hierarchy process. Construction Management and Economics 18(5), 547–557 (2000)

    Article  Google Scholar 

  6. Turkis, Z.: Multi-attribute contractors ranking method by applying ordering of feasible alternatives of solutions in terms of preferability technique. Technological and Economic Development of Economy 14(2), 224–239 (2008)

    Article  Google Scholar 

  7. Alsugair, A.: Framework for evaluating bids of construction contractors. J. Manag. Eng. 15(2), 72–78 (1999)

    Article  Google Scholar 

  8. Holt, G.D., Olomolaiye, P.O., Harris, F.: Factors influencing UK construction clients choice of contractor. Build. Environ. 29(2), 241–248 (1994)

    Article  Google Scholar 

  9. Lopes, M., Flavell, R.: Project appraisal – a framework to assess nonfinancial aspects of projects during the project life cycle. Project Management 16(4), 223–233 (1998)

    Article  Google Scholar 

  10. Bertolini, M., Braglia, M., Carmignani, G.: Application of the AHP methodology in Making a Proposal for a Public Work Contract. International Journal of Project Management 24, 422–430 (2006)

    Article  Google Scholar 

  11. Moustafa, I.M.M.: A decision Support System for the Selection of the Optimum Contractor. PhD Thesis (2001)

    Google Scholar 

  12. Faridah, M.H.: Contractor’s Perception of the Use of Statistical Approach in the Tender Evaluation at the Public Works Department, Malaysia. American Journal of Applied Sciences 4(12), 1084–1089 (2007)

    Article  Google Scholar 

  13. Mastura, J., Abdul Rashid, A., Ahmad, I.: Non Price Factors (NPF) And Contractors Selection: An Application In The Public Sector In Malaysia. In: Proceeding of The 5th IEEE International Conference on Cognitive Informatics, Beijing, China (2006)

    Google Scholar 

  14. Saaty, T.L.: Fundamentals of Decision Making and Priority Theory with the AHP. RWS Publications, Pittsburgh (1994)

    Google Scholar 

  15. Demirtas, E.A., Ustun, O.: An integrated multi-objective decision making process for supplier selection and order allocation. Omega 36, 76–90 (2008)

    Article  Google Scholar 

  16. Huang, S.H., Keskar, H.: Comprehensive and configurable metrics for supplier selection. Production Economics 105, 510–523 (2007)

    Article  Google Scholar 

  17. Lin, C.-C., Wang, W.-C., Yu, W.-D.: Improving AHP for construction with an adaptive AHP approach (A3). Automation in Construction 17, 180–187 (2008)

    Article  Google Scholar 

  18. Abudayyeh, O., Zidan, S.J., Yehia, S., Randolph, D.: Hybrid prequalification-based, innovative contracting model using AHP. Journal of Management in Engineering 23(2), 88–96 (2007); ASCE

    Article  Google Scholar 

  19. Goldenberg, M., Shapira, A.: Systematic evaluation of construction equipment alternatives: case study. Journal of Construction Engineering and Management 133(1), 72–85 (2007); ASCE

    Article  Google Scholar 

  20. Banaitienê, N., Banaitis, A.: Analysis of criteria for contractors’ qualification evaluation. Technological and Economic Development of Economy 12(4), 276–282 (2006)

    Google Scholar 

  21. Cebeci, U.: Fuzzy AHP-based decision support system for selecting ERP systems in textile industry by using balanced scorecard. Expert Systems with Applications 36, 8900–8909 (2009)

    Article  Google Scholar 

  22. Wang, J., et al.: Integration of fuzzy AHP and FPP with TOPSIS methodology for aeroengine health assessment. Expert Systems with Applications (2010)

    Google Scholar 

  23. Amiri, M.P.: Project selection for oil-fields development by using the AHP and fuzzy TOPSIS methods. Expert Systems with Applications 37, 6218–6224 (2010)

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2011 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Ahmad, F., Saman, M.Y.M. (2011). Application of Integrated Decision Support Model in Tendering. In: Özcan, A., Zizka, J., Nagamalai, D. (eds) Recent Trends in Wireless and Mobile Networks. CoNeCo WiMo 2011 2011. Communications in Computer and Information Science, vol 162. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-21937-5_39

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-21937-5_39

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-21936-8

  • Online ISBN: 978-3-642-21937-5

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics