Abstract
Business Process Management has gained importance within organizations due to the need to streamline their operations. Nevertheless, despite the existence of process modeling standards such as BPMN, nowadays it is difficult to specify complex temporal constraints and relationships among tasks of a given process, which prevents the specification and subsequent automation of processes where these restrictions are relevant. To solve the exposed difficulty, we have resorted to the project planning and management field, developing a BPMN equivalency of all temporal constraints and relationships that can be specified in a standard project planning tool: Microsoft Project. This not only enables a simple interface for specifying complex temporal restrictions in business processes, but also defines an execution semantic for the models developed in the field of project planning, allowing their later automation through process execution engines.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Similar content being viewed by others
References
van der Aalst, W.M.P., ter Hofstede, A.H.M., Weske, M.: Business process management: A survey. In: van der Aalst, W.M.P., ter Hofstede, A.H.M., Weske, M. (eds.) BPM 2003. LNCS, vol. 2678, pp. 1–12. Springer, Heidelberg (2003)
Gagné, D., Trudel, A.: Time-BPMN. In: Proceedings of 1st International Workshop on BPMN (2009)
Wilson, J.: Gantt charts: A centenary appreciation. European Journal of Operational Research 149(2), 430–437 (2003)
Object Management Group: Business Process Modeling Notation Beta 1 for Version 2.0, http://www.omg.org/spec/BPMN/2.0/
Gagné, D., Trudel, A.: The Temporal Perspective: Expressing Temporal Constraints and Dependencies. In: Process Models in BPM and Workflow Handbook (2008)
Cheng, J., Law, K.H.: Using Process Specification Language for Project Information. In: 3rd International Conference on Concurrent Engineering in Construction, Berkeley, CA, pp. 63–74 (2002)
BPMI.org, OMG: Business Process Modeling Notation Specification, Final Adopted Specification. Object Management Group (2006)
Eder, J., Paganos, E.: Managing Time in Workflow Systems. In: Fischer, L. (ed.) Workflow Handbook 2001, Future Strategies Inc. (2001)
Peltz, C.: Web Services Orchestration and Choreography. IEEE Computer 36 (2003)
Recker, J., Mendling, J.: On the Translation between BPMN and BPEL:Conceptual Mismatch between Process Modeling Languages. In: Proceedings of Workshops and Doctoral Consortium for the 18th International Conference on Advanced Information Systems Engineering (2006)
Ouyang, C., Dumas, M., ter Hofstede, A.H.M., van der Aalst, W.M.P.: From BPMN process models to BPEL Web services. In: Proceedings of the 4th International Conference on Web Services (ICWS 2006), pp. 285–292 (2006)
Microsoft Corp. MS Project Developer documentation, http://msdn.microsoft.com/en-us/library/bb251741%28v=office.12%29.aspx
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2011 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Flores, C., Sepúlveda, M. (2011). Temporal Specification of Business Processes through Project Planning Tools. In: zur Muehlen, M., Su, J. (eds) Business Process Management Workshops. BPM 2010. Lecture Notes in Business Information Processing, vol 66. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-20511-8_8
Download citation
DOI: https://doi.org/10.1007/978-3-642-20511-8_8
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-20510-1
Online ISBN: 978-3-642-20511-8
eBook Packages: Computer ScienceComputer Science (R0)