Skip to main content

Temporal Specification of Business Processes through Project Planning Tools

  • Conference paper

Part of the book series: Lecture Notes in Business Information Processing ((LNBIP,volume 66))

Abstract

Business Process Management has gained importance within organizations due to the need to streamline their operations. Nevertheless, despite the existence of process modeling standards such as BPMN, nowadays it is difficult to specify complex temporal constraints and relationships among tasks of a given process, which prevents the specification and subsequent automation of processes where these restrictions are relevant. To solve the exposed difficulty, we have resorted to the project planning and management field, developing a BPMN equivalency of all temporal constraints and relationships that can be specified in a standard project planning tool: Microsoft Project. This not only enables a simple interface for specifying complex temporal restrictions in business processes, but also defines an execution semantic for the models developed in the field of project planning, allowing their later automation through process execution engines.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. van der Aalst, W.M.P., ter Hofstede, A.H.M., Weske, M.: Business process management: A survey. In: van der Aalst, W.M.P., ter Hofstede, A.H.M., Weske, M. (eds.) BPM 2003. LNCS, vol. 2678, pp. 1–12. Springer, Heidelberg (2003)

    Chapter  Google Scholar 

  2. Gagné, D., Trudel, A.: Time-BPMN. In: Proceedings of 1st International Workshop on BPMN (2009)

    Google Scholar 

  3. Wilson, J.: Gantt charts: A centenary appreciation. European Journal of Operational Research 149(2), 430–437 (2003)

    Article  MathSciNet  MATH  Google Scholar 

  4. Object Management Group: Business Process Modeling Notation Beta 1 for Version 2.0, http://www.omg.org/spec/BPMN/2.0/

  5. Gagné, D., Trudel, A.: The Temporal Perspective: Expressing Temporal Constraints and Dependencies. In: Process Models in BPM and Workflow Handbook (2008)

    Google Scholar 

  6. Cheng, J., Law, K.H.: Using Process Specification Language for Project Information. In: 3rd International Conference on Concurrent Engineering in Construction, Berkeley, CA, pp. 63–74 (2002)

    Google Scholar 

  7. BPMI.org, OMG: Business Process Modeling Notation Specification, Final Adopted Specification. Object Management Group (2006)

    Google Scholar 

  8. Eder, J., Paganos, E.: Managing Time in Workflow Systems. In: Fischer, L. (ed.) Workflow Handbook 2001, Future Strategies Inc. (2001)

    Google Scholar 

  9. Peltz, C.: Web Services Orchestration and Choreography. IEEE Computer 36 (2003)

    Google Scholar 

  10. Recker, J., Mendling, J.: On the Translation between BPMN and BPEL:Conceptual Mismatch between Process Modeling Languages. In: Proceedings of Workshops and Doctoral Consortium for the 18th International Conference on Advanced Information Systems Engineering (2006)

    Google Scholar 

  11. Ouyang, C., Dumas, M., ter Hofstede, A.H.M., van der Aalst, W.M.P.: From BPMN process models to BPEL Web services. In: Proceedings of the 4th International Conference on Web Services (ICWS 2006), pp. 285–292 (2006)

    Google Scholar 

  12. Microsoft Corp. MS Project Developer documentation, http://msdn.microsoft.com/en-us/library/bb251741%28v=office.12%29.aspx

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2011 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Flores, C., Sepúlveda, M. (2011). Temporal Specification of Business Processes through Project Planning Tools. In: zur Muehlen, M., Su, J. (eds) Business Process Management Workshops. BPM 2010. Lecture Notes in Business Information Processing, vol 66. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-20511-8_8

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-20511-8_8

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-20510-1

  • Online ISBN: 978-3-642-20511-8

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics