As engineering and construction activities unfold, the project actual status may diverge from the planned one, with discrepancies in expenditures, productivity and speed of work. This chapter highlights the principles of accurate cost and schedule performance monitoring and control. First, it illustrates the method for measuring the actual progress of work. Second, Earned Value Analysis is quantitatively explained using an example, as well as methods for estimating the cost and schedule at completion. Then, various project reporting practices are shown. Finally, the possible control actions to bring the project back on track are discussed.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References and Additional Resources About Project Monitoring & Control
Bennet J (1985) Construction project management. Butterworths, London
CII Construction Industry Institute (2004) Project control for construction. CII, Austin, TX, pp RS6–5
Christensen DS (1999) Using the earned value cost management report to evaluate the contractor’s estimate at completion. Acquisition Rev Quart (Summer) 1999:283–295
Christensen DS, Antolini RC, McKinney JW (1995) A review of estimate at completion research. J Cost Anal Management (Spring) 1995:41–62
De Marco A, Briccarello D, Rafele C (2009) Cost and schedule monitoring of industrial building projects: case study. J Constr Eng Manage 9(1):853–862
Eldin NN (1989) Measurement of work progress: quantitative technique. J Constr Eng Manage 115(3):462–474
Fleming QW (1992) Cost/schedule control systems criteria: the management guide to C/SCSC, Rev edn. Probus Publishing Company, Chicago, IL
Hendrickson C (2008) Project management for construction, Online edn. http://www.ce.cmu.edu/pmbook/
Holm L, Schaufelberger J (2002) Management of construction projects. Prentice Hall, Upper Saddle River, NJ
Jung Y, Woo S (2004) Flexible work breakdown structure for integrated cost and schedule control. J Constr Eng Manage 130(5):616–625
Lipke W (2005) Connecting earned value to the schedule. Crosstalk: J Defense Software Eng 18(6)
Meredith JR, Mantel SJ Jr (2006) Project management: a managerial approach, 6th edn. Wiley, Hoboken, NJ
Oberlender GD (1993) Project management for engineering and construction. McGraw-Hill, New York
Pierce DR Jr (2004) Project scheduling and management for construction, 3rd edn. Reed Construction Data, Kingston, MA
Project Management Institute (2008a) A guide to the project management body of knowledge, 4th edn. Project Management Institute, Newtown Square, PA
Project Management Institute (2008b) A guide to earned value management. Project Management Institute, Newtown Square, PA
Ritz GJ (1994) Total construction project management. McGraw-Hill, New York, NY
U.S. Department of Energy (DoE) (1980) Cost & schedule control systems criteria for contract performance measurement. Implementation Guide. DoE, MA-0087, May 1980
Winch GM (2002) Managing construction projects. Blackwell Publishing, Oxford, UK
Woodward JF (1997) Construction project management getting it right first time. Thomas Telford, London
Yang YC, Park CJ, Kim JH, Kim JJ (2007) Management of daily progress in a construction project of multiple apartment buildings. J Constr Eng Manage 133(3):242–253
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2011 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
De Marco, A. (2011). Project Monitoring and Control. In: Project Management for Facility Constructions. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-17092-8_9
Download citation
DOI: https://doi.org/10.1007/978-3-642-17092-8_9
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-17091-1
Online ISBN: 978-3-642-17092-8
eBook Packages: EngineeringEngineering (R0)