Abstract
In this paper we present the evolution of project scheduling models with emphasis on temporal constraints.
Chapter PDF
Similar content being viewed by others
References
Ahuja, K., Magnanti, T., Orlin, J.: Network flows. Prentice Hall, New York (1993)
Bartusch, M., Mohring, R.H., Radermacher, F.J.: Scheduling Project Networks with Resource Constraints and Time Windows. Annals of Operations Research 16, 201–240 (1988)
Bianco, L., Caramia, M.: A New Approach for the Project Scheduling Problem with Generalized Precedence Relations. In: Proceedings of the 11th International Workshop on Project Management and Scheduling, Istanbul, April 28-30 (2008)
Bianco, L., Caramia, M.: A New Lower Bound for the Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations. Computers and Operations Research (2009a), doi:10.1016/j.cor.2009.07.003
Bianco, L., Caramia, M.: Minimizing the Completion Time of a Project Under Resource Constraints and Feeding Precedence Relations: a Lagrangian Relaxation Based Lower Bound, RR-03.09 - University of Rome “Tor Vergata” (2009b) (submitted)
Bianco, L., Caramia, M.: An Exact algorithm to minimize the makespan in project scheduling with scarce resources and feeding precedence relations, RR-07.09 - University of Rome “Tor Vergata” (2009c) (submitted)
Bianco, L., Caramia, M.: A New Formulation of the Resource-Unconstrained Project Scheduling Problem with Generalized Precedence Relations to Minimize the Completion Time. Networks (2010) (in Press)
Blazewicz, J., Lenstra, J.K., Rinnooy Kan, A.H.G.: Scheduling subject to resource constraints: Classification and complexity. Discrete Applied Mathematics 5(1), 11–24 (1983)
Clark, W.: The Gantt Chart. Pitman, New York (1954)
Demeulemeester, E.L., Herroelen, W.S.: New benchmark results for the resource-constrained project scheduling problem. Management Science 43(11), 1485–1492 (1997a)
Demeulemeester, E.L., Herroelen, W.S.: A branch-and-bound procedure for the generalized resource-constrained project scheduling problem. Operations Research 45, 201–212 (1997b)
Demeulemeester, E.L., Herroelen, W.S.: Project Scheduling - A Research Handbook. Kluwer Academic Publishers, Boston (2002)
De Reyck, B.: Scheduling projects with generalized precedence relations - Exact and heuristic approaches, Ph.D. Thesis, Department of Applied Economics, Katholieke Universiteit Leuven, Leuven, Belgium (1998)
De Reyck, B., Herroelen, W.: A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research 111(1), 152–174 (1998)
Dorndorf, U.: Project scheduling with time windows. Physica-Verlag, Heidelberg (2002)
Elmaghraby, S.E.E., Kamburowski, J.: The Analysis of Activity Networks under Generalized Precedence Relations (GPRs). Management Science 38(9), 1245–1263 (1992)
Herroelen, W.: Projectbeheersing in de Bouw, Vlaamse Confederatie Bouw, Vlaamse Ingenieurs-Kamer (1998)
Kelley, J.E.: The critical path method: Resource planning and scheduling. In: Muth, J.F., Thompson, G.L. (eds.) Industrial Scheduling, pp. 347–365. Prentice Hall, New Jersey (1963)
Klein, R., Scholl, A.: Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling. European Journal of Operational Research 112, 322–346 (1999)
Kis, T., Erdõs, G., Márkus, A., Váncza, J.: A Project-Oriented Decision Support System for Production Planning in Make-to-Order Manufacturing. ERCIM News 58, 66–67 (2004)
Kis, T.: A branch-and-cut algorithm for scheduling of projects with variable-intensity activities. Mathematical Programming 103(3), 515–539 (2005)
Kis, T.: Rcps with variable intensity activities and feeding precedence constraints. In: Perspectives in Modern Project Scheduling, pp. 105–129. Springer, Heidelberg (2006)
Goldratt, E.: Critical Chain. The North River Press, Great Barrington (1997)
Lewis, J.P.: Project Planning, Scheduling and Control. In: A Hands on Guide to Bringing Projects in on Time and on Budget. McGraw-Hill, New York (1995)
Lumsden, P.: Line of Balance Method. Pergamon Press, Exeter (1968)
Moder, J.J., Philips, C.R., Davis, E.W.: Project management with CPM, PERT and precedence diagramming, 3rd edn. Van Nostrand Reinhold Company (1983)
Neumann, K., Schwindt, C., Zimmerman, J.: Project scheduling with time windows and scarce resources. Lecture Notes in Economics and Mathematical Systems, vol. 508. Springer, Berlin (2002)
Radermacher, F.J.: Scheduling of project networks. Annals of Operations Research 4, 227–252 (1985)
Suri, R.: Quick Response Manufacturing. Productivity Press (1998)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2010 IFIP International Federation for Information Processing
About this paper
Cite this paper
Bianco, L., Caramia, M. (2010). Advanced Topics in Project Management Process. In: Vallespir, B., Alix, T. (eds) Advances in Production Management Systems. New Challenges, New Approaches. APMS 2009. IFIP Advances in Information and Communication Technology, vol 338. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-16358-6_53
Download citation
DOI: https://doi.org/10.1007/978-3-642-16358-6_53
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-16357-9
Online ISBN: 978-3-642-16358-6
eBook Packages: Computer ScienceComputer Science (R0)