Skip to main content

Considering Subcontractors in Distributed Scrum Teams

  • Chapter
  • First Online:
Agility Across Time and Space

Abstract

In this chapter we present our experiences with working with subcontractors in distributed Scrum teams. The context of our experiences is a medium size software service provider company. We present the way the subcontractors are selected and how Scrum practices can be used in real-life projects. We discuss team arrangements and tools used in distributed development teams highlighting aspects that are important when working with subcontractors. We also present an illustrative example where different phases of a project working with subcontractors are described. The example also provides practical tips on work in such projects. Finally, we present a summary of our data that was collected from Scrum and non-Scrum projects implemented over a few years. This chapter should provide a practical point of view on working with subcontractors in Scrum teams for those who are considering such cooperation.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 54.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Rudzki, J., Systä, T., & Mustonen, K. (2009). Subcontracting processes in software service organisations—an experience report. In Q. Wang, V. Garousi, R. J. Madachy, & D. Pfahl (Eds.), Lecture notes in computer science : Vol. 5543. ICSP (pp. 224–235). Berlin: Springer.

    Google Scholar 

  2. Rudzki, J., Hammouda, I., & Mikkola, T. (2009). Agile experiences in a software service company. In SEAA ’09. 35th Euromicro conference (pp. 224–228). Washington: IEEE Computer Society.

    Google Scholar 

  3. Basili, V. R., Caldiera, G., & Rombach, H. D. (1994). Goal question metric paradigm. In J.J. Marciniak (Ed.), Encyclopaedia of software engineering (Vol. 1, pp. 528–532).

    Google Scholar 

  4. Bird, C., Nagappan, N., Devanbu, P., Gall, H., & Murphy, B. (2009). Does distributed development affect software quality? An empirical case study of windows vista. In ICSE ’09: Proceedings of the 2009 IEEE 31st international conference on software engineering (pp. 518–528). Washington: IEEE Computer Society.

    Google Scholar 

  5. Siakas, K. V., & Balstrup, B. (2006). Software outsourcing quality achieved by global virtual collaboration. Software Process: Improvement and Practice, 11(3), 319–328.

    Article  Google Scholar 

  6. Hyder, E. B., Heston, K. M., & Paulk, M. C. (2006). The esourcing capability model for service providers (escm-sp) v2.01, part 1—the escm-sp-v2: Model overview. CMU-ITSQC-06-006, Pittsburgh, PA: IT Services Qualification Center, Carnegie Mellon University.

    Google Scholar 

  7. Hyder, E. B., Heston, K. M., & Paulk, M. C. (2006). The esourcing capability model for service providers (escm-sp) v2.01, part 2—the escm-sp-v2: Practice details. CMU-ITSQC-06-007. Pittsburgh, PA: IT Services Qualification Center, Carnegie Mellon University.

    Google Scholar 

  8. Fowler, M. (2006). Using an agile software process with offshore development. Available online. http://martinfowler.com/articles/agileOffshore.html. Cited July 2006.

  9. Schwaber, K. (1997). Scrum development process. In J. Sutherland et al. (Eds.), OOPSLA business object design and implementation workshop. London: Springer.

    Google Scholar 

  10. Sutherland, J., Viktorov, A., Blount, J., & Puntikov, N. (2007). Distributed scrum: Agile project management with outsourced development teams. In HICSS ’07: Proceedings of the 40th annual Hawaii international conference on system sciences (p. 274a). Washington: IEEE Computer Society.

    Google Scholar 

  11. Paasivaara, M., Durasiewicz, S., & Lassenius, C. (2008). Using scrum in a globally distributed project: A case study. Software Process: Improvement and Practice, 13(6), 527–544.

    Article  Google Scholar 

  12. Herbsleb, J. D., Atkins, D. L., Boyer, D. G., Handel, M., & Finholt, T. A. (2002). Introducing instant messaging and chat in the workplace. In CHI ’02: Proceedings of the SIGCHI conference on human factors in computing systems (pp. 171–178). New York: ACM.

    Google Scholar 

  13. Cohn, M. (2005). Agile estimating and planning. New York: Prentice Hall.

    Google Scholar 

  14. Kniberg, H. (2008). Version control for multiple agile teams. Available online. http://www.infoq.com/articles/agile-version-control.

  15. Fowler, M. (2006). Continuous integration. Available online. http://martinfowler.com/articles/continuousIntegration.html.

Further Reading

  1. Eckstein, J. (2004). Agile software development in the large: Diving into the deep. Cambridge: Dorset House Publishing Company.

    Google Scholar 

  2. Upadrista, V. (2008). Managing offshore development projects: An agile approach. Oshawa: Multi-Media Publications.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Jakub Rudzki .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2010 Springer-Verlag Berlin Heidelberg

About this chapter

Cite this chapter

Rudzki, J., Hammouda, I., Mikkola, T., Mustonen, K., Systä, T. (2010). Considering Subcontractors in Distributed Scrum Teams. In: Šmite, D., Moe, N., Ågerfalk, P. (eds) Agility Across Time and Space. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-12442-6_16

Download citation

  • DOI: https://doi.org/10.1007/978-3-642-12442-6_16

  • Published:

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-642-12441-9

  • Online ISBN: 978-3-642-12442-6

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics