Abstract
Just-in-time manufacturing has become increasingly popular in the last three decades. Today it reaches far beyond Toyota’s manufacturing plants and is adopted in various industries globally. Lean production, an umbrella term for just-in-time, includes several tools that can benefit from fuzziness. In this chapter, we present Kanban card number calculation and two scheduling models. We also demonstrate the models through numerical examples where appropriate.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Chang, T.M., Yih, Y.: A fuzzy rule-based approach for dynamic control of kanbans in a generic kanban system. International Journal of Production Research 36(8), 2247–2257 (1998)
Framinan, J.M., Gonzales, P.L., Ruiz-Usano, R.: The CONWIP production control system: review and research issues. Production Planning & Control 14(3), 255–265 (2003)
Goldratt, E.M.: Computerized shop floor scheduling. International Journal of Production Research 26(3), 443–455 (1988)
Gunasekaran, A.: Agile manufacturing: A framework for research and development. International Journal of Production Economics 62, 87–105 (1999)
Hopp, W., Spearman, M.L.: Factory Physics. McGraw Hill Higher Education, New York (2008)
Kumar, C.S., Panneerselvam, R.: Literature review of JIT-KANBAN system. Journal of Advanced Manufacturing Technology 32, 393–408 (2007)
Mabin, V.J., Balderstone, S.J.: The World of the theory of constraints: A review of the international literature. The St. Lucie Press/Apics Series on Constraints Management (2000)
Monden, Y.: Toyota production system: An integrated approach to Just-In-Time, 3rd edn. Engineering & Management Press (1998)
Nicholas, J.: Competitive manufacturing management. Irwin/McGraw Hill Publishing (2008)
Porche, R.A.: Doing more with less: lean thinking and patient safety in health care. Joint Commission Resources, Inc., USA (2006) ( Edited Volume)
Rahman, S.U.: Theory of constraints A review of the philosophy and its applications. International Journal of Operations & Production Management 18(4), 336–355 (1998)
Santos, J., Wysk, R.A., Torres, J.M.: Improving production with lean thinking. John Wilen & Sons, Inc., New Jersey (2006)
Silveira, G.D., Borenstein, D., Fogliatto, F.S.: Mass customization: Literature review and research directions. International Journal of Production Economics 72, 1–13 (2001)
Suri, R.: Quick response manufacturing: a companywide approach to reducing lead times. Productivity Press (1998)
Wang, W., Wang, D., Ip, W.H.: JIT production planning approach with fuzzy due date for OKP manufacturing systems. International Journal of Production Economics 58, 209–215 (1999)
Wong, W.K., Kwong, C.K., Mok, P.Y., Ip, W.H.: Genetic optimization of JIT operation schedules for fabric-cutting process in apparel manufacture. Journal of Intelligent Manufacturing 17, 341–354 (2006)
Wu, C., Gu, X.: A genetic algorithm for flow shop scheduling with fuzzy processing time and due date. In: Proceedings of the 5th World Congress on Intelligent Control, Hangzhou, P.R. China (2004)
Yavuz, M., Akcali, E.: Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches. International Journal of Production Research 45(16), 3579–3597 (2007)
Yi, Y., Wang, W.: Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines. Journal of Intelligent Manufacturing 14, 311–322 (2003)
Yu, A., Gu, X.: Application of cultural algorithms to earliness/tardiness flow shop with uncertain processing time. In: Third International Conference on Natural Computation (2007)
Zheng, L., Gu, X.: Fuzzy production scheduling in no-wait flow shop to minimize the makespan with E/T constraints using SA. In: Proceedings of the 5th World Congress on Intelligent Control, Hangzhou, P.R. China (2004)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2010 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
Yavuz, M. (2010). Fuzziness in JIT and Lean Production Systems. In: Kahraman, C., Yavuz, M. (eds) Production Engineering and Management under Fuzziness. Studies in Fuzziness and Soft Computing, vol 252. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-12052-7_4
Download citation
DOI: https://doi.org/10.1007/978-3-642-12052-7_4
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-12051-0
Online ISBN: 978-3-642-12052-7
eBook Packages: EngineeringEngineering (R0)