Abstract
The reference model employing constraint programming (CP) paradigm describes both an enterprise and a set of project-like production orders. Moreover, encompassing consumer orders requirements and available production capabilities, the model provides the formal framework allowing one to develop a class of decision support systems aimed at interactive production process planning subject to multi-project environment constraints. In that context our contribution provides a knowledge-based and CP-driven approach to renewable and nonrenewable resources allocation assuming precise character of decision variables. The proposed concept of a context dedicated constraint satisfaction problem can be seen as a new formal framework for developing a task oriented Decision Support Tool for Project Portfolio Prototyping (DST4P3). The tool provides a prompt and interactive service to a set of routine queries formulated either in straight or reverse way.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Bach, I., Bocewicz, G., Banaszak, Z.: Constraint programming approach to time-window and multiresource-constrained projects portfolio prototyping. In: Nguyen, N.T., Borzemski, L., Grzech, A., Ali, M., et al. (eds.) IEA/AIE 2008. LNCS (LNAI), vol. 5027, pp. 767–776. Springer, Heidelberg (2008)
Bach, I., Wójcik, R., Bocewicz, G.: Projects portfolio prototyping subject to imprecise activities specification. In: Conference proceedings of 14th International Congress of Cybernetics and Systems of WOSC – ICCS 2008, Wroclaw, Poland, pp. 261–272 (2008)
Banaszak, Z.: CP-based decision support for project-driven manufacturing. In: Józefowska, J., Węglarz, J. (eds.) Perspectives in Modern Project Scheduling. International Series in Operations Research and Management Science, vol. 92, pp. 409–437. Springer, New York (2006)
Banaszak, Z., Bocewicz, G., Bach, I.: CP-driven Production Process Planning in Multiproject Environment. In: Decision Making in Manufacturing and Services, vol. 2(1-2), pp. 5–32 (2008)
Banaszak, Z., Zaremba, M.,, Muszyński, W.: CP-based decision making for SME. In: Horacek, P., Simandl, M., Zitek, P. (eds.) Preprints of the 16th IFAC World Congress, DVD, Prague, Czech Republic (2005)
Barták, R.: Incomplete Depth-First Search Techniques: A Short Survey. In: Figwer, J. (ed.) Proceedings of the 6th Workshop on Constraint Programming for Decision and Control, pp. 7–14 (2004)
Beale, E.M.L.: Branch and bound methods for mathematical programming systems. In: Hammer, P.L., Johnson, E.L., Korte, B.H. (eds.) Discrete Optimization II, pp. 201–219. North Holland Publishing Co., Amsterdam (1979)
Bocewicz, G., Banaszak, Z., Wójcik, R.: Design of admissible schedules for AGV systems with constraints: a logic-algebraic approach. In: Nguyen, N.T., Grzech, A., Howlett, R.J., Jain, L.C. (eds.) KES-AMSTA 2007. LNCS (LNAI), vol. 4496, pp. 578–587. Springer, Heidelberg (2007)
Bubnicki, Z.: Learning processes and logic-algebraic method for the systems with knowledge representation. Systems analysis and management. PAS, Warsaw (1999)
Chanas, S., Komburowski, J.: The use of fuzzy variables in PERT. Fuzzy Sets and Systems 5(1), 11–19 (1981)
Dubois, D., Fargier, H., Fortemps, P.: Fuzzy scheduling: Modeling flexible constraints vs. coping with incomplete knowledge. European Journal of Operational Research 147, 231–252 (2003)
Martinez, E.C., Duje, D., Perez, G.A.: On performance modeling of project-oriented production. Computers and Industrial Engineering 32, 509–527 (1997)
Puget, J.-F.: A C++ Implementations of CLP. In: Proceeding of SPICS 1994 (1994)
Russell, S., Norvig, P.: Artificial Intelligence: A Modern Approach, 2nd edn. Prentice Hall, Englewood Cliffs (2002)
Schutle, H., Smolka, G., Wurtz, J.: Finite Domain Constraint Programming in Oz. German Research Center for Artificial Intelligence, Germany, D-66123 Saarbrucken (1998)
Sung, C.S.: A Production Planning Model for Multi-Product Facilities. Journal of the Operations Research Society of Japan 28(4), 345–385 (1985)
Van Hentenryck, P.: Constraint Logic Programming. Knowledge Engineering Review 6, 151–194 (1991)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2009 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
Bocewicz, G., Banaszak, Z.A. (2009). Abductive Inference Based Approach to DSS Designing for Project Portfolio Planning. In: Nguyen, N.T., Szczerbicki, E. (eds) Intelligent Systems for Knowledge Management. Studies in Computational Intelligence, vol 252. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-04170-9_5
Download citation
DOI: https://doi.org/10.1007/978-3-642-04170-9_5
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-04169-3
Online ISBN: 978-3-642-04170-9
eBook Packages: EngineeringEngineering (R0)