Skip to main content

Unbundling – Strategic and Organisational Challenges for Power and Supply Companies

  • Chapter
  • First Online:
Handbook Utility Management
  • 1511 Accesses

Abstract

One of the most important consequences of liberalising the electricity sector has been the vertical unbundling of activities. The creation of companies specialising in transmission and system operation activities has become crucial in liberalised markets. The transmission system operation (TSO) model, in which the same company carries out both transmission and system operation activities, is the one more generally used in Europe. Compared with the independent system operation (ISO) model, where system operation and transmission are developed by different companies, this model presents many advantages in terms of efficiency and security of supply based on the synergies coming from the integration of functions within the same company. The independence of TSOs is essential to preserve efficient functioning of the electricity market. Ownership unbundling of TSOs is the most effective way to achieve such independence.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 249.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  • De Quinto, J. 2001. Revisión del marco regulador de las actividades de Red Eléctrica en España: Comares – Fundación de Estudios de Regulación.

    Google Scholar 

  • De Quinto, J. 2008. La posición de España (y de otros agentes del sector eléctrico) respecto a la independencia del transporte y la operación del sistema. Revista Electricidad n° 35 Julio – Agosto 2008.

    Google Scholar 

  • European Union. Directive 96/92/EC of the European Parliament and of the Council of 19 December 1996 concerning common rules for the internal market in electricity, OJ L 27/20 of 30.1.1997.

    Google Scholar 

  • European Union. Directive 2003/54/EC of the European Parliament and of the Council of 26 June 2003 concerning common rules for the internal market in electricity and repealing Directive 96/92/EC, OJ L 176/37.

    Google Scholar 

  • European Union. Proposal for a Directive of the European Parliament and of the Council amending Directive 2003/54/EC concerning common rules for the internal market in electricity, 2007/0195 (COD), February 2008.

    Google Scholar 

  • Red Eléctrica de España. 2005. El libro de los 20 años. Madrid.

    Google Scholar 

  • U.S.-Canada power system outage task force. 2004. Final report on the August 14, 2003 blackout in the United States and Canada: causes and recommendations.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2008 Springer-Verlag Berlin Heidelberg

About this chapter

Cite this chapter

Serna, L.A. (2008). Unbundling – Strategic and Organisational Challenges for Power and Supply Companies. In: Bausch, A., Schwenker, B. (eds) Handbook Utility Management. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-79349-6_15

Download citation

Publish with us

Policies and ethics