Skip to main content
  • 1964 Accesses

Abstract

Both in preliminary evaluations and final feasibility studies the deposit under investigation is frequently compared to other deposits which are either in production or still in the preproduction stage. The best comparison is an economic one. This can be done via the payback period (Sect. 11.1.3), the earning power of a project expressed as the internal rate of return IRR (Sect. 11.2.4) or the standardized net present value NPV (Sect. 11.2.3.4).

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 49.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 64.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 99.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Rights and permissions

Reprints and permissions

Copyright information

© 2008 Springer-Verlag Berlin Heidelberg

About this chapter

Cite this chapter

(2008). Comparison of Deposits. In: Economic Evaluations in Exploration. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-73559-5_14

Download citation

Publish with us

Policies and ethics