Abstract
This chapter continues the inventory control problem studied in the previous chapter. The new system is shown in Fig. 17.1. We have added two things to the model in Chap.16: (1) backlogging (bsackordering) which is shown in Fig. 17.1 as an increase in demand to Di+si, 2 ≨ i ≨ N; and (2) delivery lag shown as a 80% chance that an order arrives at the start of a period and a 20% chance that it arrives at the start of the next period. We assume that these probabilities, the 0.80 and 0.20, are known and will not be fuzzy. A fuzzy inventory problem similar to this has been considered in [1].
Preview
Unable to display preview. Download preview PDF.
Author information
Authors and Affiliations
Rights and permissions
About this chapter
Cite this chapter
J. Buckley, J. Inventory Control II. In: Simulating Fuzzy Systems. Studies in Fuzziness and Soft Computing, vol 171. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-32375-4_17
Download citation
DOI: https://doi.org/10.1007/978-3-540-32375-4_17
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-24116-4
Online ISBN: 978-3-540-32375-4
eBook Packages: EngineeringEngineering (R0)